Laserfiche WebLink
<br />3. The system shall have a method of canceling any unit from an event. <br /> <br />.. <br /> <br />~1I"1"'_...at... <br /> <br />I Positron Response: IQ/CAD Complies <br /> <br />4. The system shall record all unit activity to a unit log. <br /> <br />I Positron Response: IQ/CAD Complies <br /> <br />5. The system shall allow units to be put on duty from both a preformatted screen and a command line. <br />The on-duty entry must include the duty assignment and personnel identification information at a <br />minimum. <br /> <br />I Positron Response: IQ/CAD Complies <br /> <br />6. The system shall allow for assigning individual personnel to an individual unit. Any number of staff shall <br />be allowed in anyone unit. <br /> <br />I Positron Response: IQ/CAD Complies <br /> <br />7. The system shall support the ability to activate an entire shift by duty roster. <br />I Positron Response: IQ/CAD Complies <br /> <br />8. The CAD system shall allow for the entry of beginning and ending mileage as part of a unit status <br />change when transporting subjects. <br /> <br />I Positron Response: IQ/CAD Complies <br /> <br />5.1.11 Status Monitors <br /> <br />1. Each console operator position shall be equipped with the ability to continuously monitor event and unit <br />statuses. <br /> <br />I Positron Response: IQlCAD Complies <br /> <br />CHANGE ORDER #2 to Computer Aided Dispatch Purchase Agreement A-2004-229 <br />EXHIBIT G-1 IQ/CAD System Updated Response Criteria <br /> <br />Page 142 of 149 <br /> <br />r <br /> <br />