Laserfiche WebLink
3111008 <br />Ma,,ruan. <br />Bid <br />Gas installation <br />A A!Sempra Energy onbty THIS IS NOT A BILL - DO NOT REMIT PAYMENT. <br />wing and cost estimating Tor me auuv= I__._.�_� r —r-• ••__ ___. _ _ <br />you have the opportunity to select the utility as the installer or you may hire a qualified <br />the installation as described in Line Extension Rule 20. <br />required by the California Public Utilities Commission, you are being provided the estimated installation cost <br />I) prior to the Issuance of a line extension contract- The bid is broken down between the cost for <br />work the utility must perform, the work that can be performed by your qualified contractor, inspection fees, <br />tax. You must declare which installation option you wish to pursue in the space provided. Work on <br />r nrntect can not continue until you have made your selection and returned the executed form to SoCalGas. <br />Installation Cost Breakdown <br />A: Estimated wst If installat)(rn is Performed by <br />$c,00 Id)MSA(s) $23683 (e)Tax S760,97 Total <br />3: Sobalua5 ...____ <br />as' estimated cost for the work the applicant can perform under the app0cant installation (fh), and tax <br />SoCaIGas and applicant work performed (Q. <br />SODO (b)SerNcets) $736.41 (,)Stub(.) S000 (d)MSA(s) F23o 83 (e)inapectlon bi 25840 (BTax <br />S0.00 (g)Serdce(s) 52,831 Fo @)Stub(.) SO oo Total cost (A tbru l) <br />3ered One Bax <br />1 <br />fdy signature confirms my understanding that the bid price consists of the estimated cost for work SoCalGas must <br />perform and the estimated cost of all remaining work If SoCalGas is selected as the installer (Option A}, If I select <br />O lion B and elect to have my contractor arform less than all the remaining work I understand that a new bid <br />will aeed to be prgpared A new bid may gso be required if the assumodotis that the NO was based on chance. This <br />bid will remain in effect URq!L 011312000 <br />at. cor•amcT <br />