Laserfiche WebLink
Deliverables for this project included aerial mapping, 50 foot cross sections, survey of all <br />surface <br />evidence of underground utilities, together with centerline monumentation recovery, and <br />centerline <br />and right of way establishment. <br />Client Contacts: Jason Gabriel, City of Santa Ana, (714) 647-5664 <br />Mindy Ly, City of Santa h a , (714) 647-5665 <br />Thomas Perez, City of Santa h a , (7 14) 647-5632 <br />Lee Martin, City of Santa Ana, (714) 647-5030 <br />Exposition Metro Line Construction Authority <br />As a member of the design-build team for the Mid- <br />CityIExposition Light Rail Transit Project, Johnson-Frank <br />ernbloyed Laser sc-&ming Technology to survey the fkeeway <br />d a c e and the undersides of the Flower and Adams bridges <br />over the 110 &way. Laser Scanning Technology allowed us <br />to obtain a high degree of accuracy on the structures in question <br />traffic obstructions <br />of any kind. In <br />addition, it allowed <br />I <br />us to keep our <br />survey personnel out of harm's way, away from the high <br />speed traffic on the lkeway at all times. <br />Contact: Mr. Calvin Yoshitake, Design-Build Team Lead Surveyor, (562) 863-7762 <br />51 50 E. Hunter Ave. 4 Anaheim, CA 92807 <br />(71 4) 777-8877 alanfrank@johnson-frank.com FAX: (714) 777-1 641 <br />Johnson-Frank & Associates, Inc. <br />On-Call Aerial Mapping & Surveying Services <br />^'ity~of~antaAna <br />ZDIQ Contract for Surveying and Mapping -Contract No. DACW09-02-D-0016 <br />This contract was awarded in May of 2001. To date, eight (8) task orders have been issued <br />totaling <br />over $525,000. Among these, five (5) have been aerial mapping or a combination of aerial <br />and <br />ground survey mapping. These projects are as follows: <br />Whitewater River, Thousand Palms, California: This project totaled <br />$162,191. It included 41 aerial control panels and aerial mapping of over <br />2,600 acres of desert terrain. This terrain included sparsely vegetated desert, <br />sand dunes, washes, and desert wildlife habitat preserves. This project was <br />completed on time and within budget. <br />Malibu Creek, Malibu, California: This project totaled $46,690. It included 12 aerial <br />control <br />15 <br />25K-17 <br />