My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
MIKE BUBALO CONSTRUCTION CO., INC. (ROUSSELLE STREET FLOOD PROTECTION PROJECT)
Clerk
>
Contracts / Agreements
>
M
>
MIKE BUBALO CONSTRUCTION CO., INC. (ROUSSELLE STREET FLOOD PROTECTION PROJECT)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/8/2025 11:34:41 AM
Creation date
4/8/2025 11:34:40 AM
Metadata
Fields
Template:
Contracts
Company Name
MIKE BUBALO CONSTRUCTION CO., INC.
Contract #
P23-6627
Agency
Public Works
Council Approval Date
1/21/2025
Expiration Date
1/1/1900
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
9
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CITY OF SANTA ANA <br /> PROPOSAL <br /> PROJECT NO.: 23-6627 <br /> ROUSSLI.I.F. STREET FLOOD PROTECTION TION PROJECT <br /> Item Description Qty Unit Unit Price Amount <br /> 8"Class 350 Ductile Iron 11 titer Main <br /> 40 Vertical OtTsct Per C.S.A.Std. I41 3A So LE S S <br /> 'tiitlt Adapters per C.S.A.Sid. 1-443 600.00 48,000.00 <br /> Signing and Striping(Includes Removal <br /> 41 or Existing Striping;Pavement 1 LS S S <br /> Nlarhinus) 20,000.00 20.000.00 <br /> 42 Additional Potholing(As-Needed)" L:A 55,000.00 y 25,000.00 <br /> 43 Tree Removal and Replacement(As- 7 EA S S <br /> Needed) 5,000.00 35,000.00 <br /> -I-I Root Shaving(As-Needed)'` 15 EA S 700.00 S 10,500.00 <br /> 45 90-flay Landscape Establishment I LS S 8,000.00 S 8,000.00 <br /> 46 Construction Permit I I.S S 17.669 S 17.669 <br /> Bid Alternates <br /> l f f <br /> 47 Add-Alt Landscaping I I.S S $ <br /> 55,000.00 55,000.00 <br /> TOTAL BASE BID S4 058,259.00 <br /> TOTAL ADD ALTERNATE BID S4,113,259.00 <br /> L.. <br /> The lowest responsible bidder shall he selected based on the total base bid. The C itv reserves the <br /> right to award the [3ase Bid, and an). all, or none of the add-alternate hid items(il'any), <br /> 4' The quantity for this bid item is shown l n- bid comparison on!). This hid item shall not be <br /> subject to the"25%"limit as stated in Section 7-3.5 of the Standard Specifications. The actual <br /> amount Ibr this item will be dictated by the actual quantity used. and the Agency reserves the <br /> right to increase or decrease the quantity of this item accordingly. <br /> This hid item is considered a Specialty Item per Section 3-2 of the Standard Specifications. <br /> TIME FOR COMPLETION OF IMPROVEMENTS AND LIQUIDATED DAMAGES <br /> The undersigned bidder hereh) proposes to complete the Work Ibr the total base bid amount <br /> shown above.within 200 working days after the commencement date stated in the Notice to <br /> Proceed. Upon issuance of the Notice to Proceed. Contractor shall immediately place order for <br /> lon4g-lead time items (i.e. Reinforced Concrete Box storm drain. Filterra Units. etc.) in <br /> accordance with grant funding requirements. Work shall be completed b) December 31. 2025. <br /> Refer to the Grant Agreement included in Appendix K. <br /> The liquidated damages amount. in Iieu ol'the amount specified in Subsection 6-9 of the <br /> Standard Specifications.shall be S3.75U per calendar clay. <br /> P-3 nif P-20 <br />
The URL can be used to link to this page
Your browser does not support the video tag.