My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Agenda Packet_2025-04-15
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2025
>
04/15/2025 Regular
>
Agenda Packet_2025-04-15
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/9/2025 2:50:36 PM
Creation date
4/9/2025 2:42:15 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Date
4/15/2025
Destruction Year
P
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
1336
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SUPPORT TEAM AND CREW: <br />* A trained and 'responsive labor force of up to 7 simultaneous skilled <br />labo're'rs, available fo'r 'rapid deployment on City assignments. <br />* Cross-trained in demolition, erosion cont'rol setup, fencing, abatement <br />p'rep, and site 'resto'ratton tasks. <br />With deep knowledge of local codes, AQMD Rule 14(?)3, CDPH guidelines, and a <br />commitment to safety, SoCal Removal is fully equipped to se'rve as a 'reliable <br />pa'rtner to the City of Santa Ana. <br />PROPOSED WORK PLAN: <br />SoCal Removal unde'rstands the c'ritical impo'rtance of safety, regulato'ry <br />compliance, and 'responsiveness in p'roviding demolition and abatement <br />se'rvices to the City of Santa Ana. Ou'r app'roach is designed to exceed <br />expectations by emphasizing communication, compliance, and envi'ronmental <br />responsibility at every p'roject phase. <br />APPROACH TO RENDERING SERVICE: <br />* Conduct a comp'rehensive site visit and hazard assessment prior to <br />mobilization. <br />@ Coordinate and obtain city permit applications and all requi'red 'regulatory <br />notifications including SCAQMD Rule 1403 and Cal/OSHA requi'rements. <br />* Schedule and pe'rform asbestos and/or lead abatement using ce'rtified <br />pe'rsonnel and EPA-compltant disposal methods. <br />* Execute systematic st'ructu'ral demolition with an emphasis on minimizing <br />dust, noise, and impact to the su'r'rounding community. <br />* Recycle and salvage materials to the g'reatest extent possible to suppo'rt <br />the City's envi'ronmental goals. <br />ii Finalize site wo'rk th'rough deb'ris 'removal, <br />cont'rol installation to leave the site clean <br />backfill, q'rading, and e'rosion <br />and stabilized. <br />4 <br /> <br /> <br />City Council 20 – 28 4/15/2025
The URL can be used to link to this page
Your browser does not support the video tag.