Laserfiche WebLink
shall include: <br />(a). Tlie address of the property to be demolished. <br />(kl).Tlie anticipated start and end dates for the demolition work. <br />(c). A description of potential impacts, such as noise, dust, or road closures, <br />along with mitigation measures. <br />(d). Contact infoi'ination for the Coritractor and the City of Santa Ana Code <br />Enforcement Division. <br />ii. 3-Day Notification. A follow-up written notice shaIl be issued no less than <br />three (3) calendar days prior to the commencement of demolition activities. <br />This notice shall reiterate the details provided in the 10-Day Notification and <br />confirm any updates to the schedule or project details. <br />(3) All notifications pursuant to tliis Agree.inent must be delivered through methods <br />reasonably calculated to ensure receipt, including direct mail, hand delivery, door <br />hangers, or other communication methods agreed and approved, in a signed writing, by <br />the Executive Director of the Planning and Building Agency, or their designee. The <br />Contractor shall maintain records of all notifications and provide copies to tlie City <br />upon request. <br />(4) Signage must comply with the following: <br />i. Temporary signage must be posted if street closure and ariy public right of way <br />wilI be affected. Temporary signage shall consist of parl<ing signs, directional <br />signs, or other traffic control signs, and be installed ten (10) days before the <br />commencement of demolition activities. <br />ii. All temporary signs must be reviewed and approved, in a signed writing, by the <br />Executive Director of tlie Public Works Agency or their designee piior to <br />posting. Failure to comply with tl'iese notifications requirements may result in <br />termination and any cost recovery to complete the demolition project. <br />COMPENSATION <br />a. City neither warrants nor guarantees any minimum or maximum compensation to Contractor <br />under tliis Agreement. Contractor sliall be paid only for actual services performed under this <br />Agreement at the rates and charges identified in Exhibit B. Contractor is one of four (4) <br />contractors selected to provide demolition services on an on-call basis under RFP No. 25-027. <br />The total compensation for these services provided by all such contractors selected under RFP <br />25-027 shall not exceed the shared aggregate amount of Six I4undred Thousand Dollars and <br />Zero Cents ($600,000) during the term of the Agreement, including any extension periods. <br />  <br />  <br />City Council 20 – 190 4/15/2025