Laserfiche WebLink
CITY OF SANTA ANA <br />Contractor Is responsible for demolishing all improvements, includlng: 4" thick concrete slab <br />foundation and footings to a depth of 3', and all suirounding landscaplng, Contractor Is also <br />responsible for clearing the site, grading the parcel for drainage, capplng all sewer llnes, and <br />compacting to 90% density. Erosion control to Include importlng and exporting fill dirt as needed, <br />Installing straw waddles around site perimeter, topping site with 1" base course to prevent wlnd <br />erosion, and Installing rumble plates for the duration of the demolition. <br />Prlce provided belowshall be based solely on the Information provided hereon and shall be an all- <br />Inclusive price and shall include all Items listed and cover all Items or work identified above and <br />Appendix - Attachment 4 to deliver a clear site with no remainlng improvetnents, <br />0@(HpB0y %B@B; J&G Industries Inc <br />1301 W.llth8treet, 8anta Aha, CA <br />Item Description Cost <br />Permitting <br />$ <br />600.00 <br />F=nglneerlng <br />$ <br />1,000.00 <br />Site Fencing for Duration of Demolition <br />$ <br />800.00 <br />Canopy BMP's/Erosion Control Plan <br />$ <br />2,420.00 <br />Asbestos/Hazardous Stabilization and Abatement <br />(on a separate sheet, provide a detail cost for this <br />lump sum amount) <br />$ <br />23, 100,00 <br />Universal Waste Disposal <br />$ <br />725.00 <br />Interior Demolition <br />$ <br />0.00 <br />ExterlorWall/Building/Foundation Demolition <br />$ <br />19,500.00 <br />Sitework Demolitlon <br />$ <br />9,375.00 <br />Landscape and Trees Removal and Clearing <br />$ <br />3,650.00 <br />Vermin Abatement (Assume present) <br />$250.00 <br />Bee Colony Abatement (Assume present) <br />$325.00 <br />cap sewer !7825.00 <br />Other (describe...)'aa8e Lot in S3, 675. 00 <br />$ <br />4,500.00 <br />Total Prlce <br />$ <br />66,245.00 <br />Clly of Sanla Ana RFP No. 25-027 Page 24 or41  <br />  <br />City Council 20 – 225 4/15/2025