Laserfiche WebLink
(E) <br />CITY OF SANTA ANA <br />c) A completion letter indicating that all asbestos containing materials from these <br />properties have been abated and properties are ready to be demolished. <br />C. Lead Removal: <br />1) The Contractor shall take all necessary precautions and follow all Occupational Safety & <br />Health Administration (OSHA')s guidelines required in the handling of lead contained <br />materials if any are detected. <br />a) Please refer to the Lead Hazard Evaluation Report which will be provided to the <br />Contractor prior to on -call bid. <br />D. Rat and/or Vermin Abatement <br />1) Contractor, prior to performing demolition, is responsible for providing rat and/or vermin <br />abatement. <br />a) As part of the demolition completion package, written certification will be provided to <br />the City, stating that such work was performed, and that the structures were free of <br />infestation prior to the demolition taking place. <br />E. Erosion Control <br />1) Prior to performing work under this Agreement, Contractor shall prepare erosion and <br />sediment control plan for the approval of the Plan Check Engineer. <br />a) The plan shall be prepared per the applicable guidelines described in the latest <br />version of the Orange County Program Construction Runoff Guidance Manual <br />(http://www.ocwatersheds.com/documents/bm p/constructionactivities), <br />2) The Contractor shall submit the plans for review and shall make the necessary revisions <br />to the plans as directed by the City. <br />3) The plans shall be prepared by a Civil Engineer licensed in the State of California. <br />a) The City may waive the requirement of licensed Civil Engineer if the Contractor can <br />satisfactorily prove to the City that the person preparing the erosion control plan is <br />qualified in the field of erosion control. <br />4) The Contractor shall keep a copy of the erosion control plan on -site for the duration of <br />the contract and shall provide all necessary control devices to implement all necessary <br />measures as shown on the plan. <br />a) The erosion control plan shall remain in effect until approval to remove is granted by <br />the City. <br />5) All erosion control materials shall be available on -site and stockpiled at a convenient <br />location to facilitate rapid construction of temporary devices when rain is eminent. <br />City of Santa Ana RFP No. 25-027 Page 22 of 41 <br />