My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Item 24 - Agreement No. 2025-01 - MLC Holdings
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2025
>
04/15/2025
>
Item 24 - Agreement No. 2025-01 - MLC Holdings
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/14/2025 9:53:01 AM
Creation date
4/9/2025 3:24:05 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Planning & Building
Item #
24
Date
4/15/2025
Destruction Year
P
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
292
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
6. All mechanical equipment shall be screened from view from public and courtyard <br />areas. <br />7. All balconies shall be designed and constructed with adequate drainage systems <br />to prevent water accumulation and ensure proper runoff, subject to review and <br />approval by the Planning Division prior to issuance of building permits. <br />8. Applicant must submit Covenants, Conditions and Restrictions (CC&Rs) for the <br />Project to the case planner for review and approval prior to the final map being <br />recorded. <br />9. The following parking management practices shall be incorporated into the final, <br />recorded CC&Rs and shall apply through the life of the Project: <br />a. Requiring onsite parking permits (such as stickers or hang -tags) for any parking <br />in the surface guest parking spaces; <br />b. Policies for maximum time vehicles maybe parked in the surface guest spaces; <br />c. Policies for towing unauthorized vehicles; vehicles parked in unauthorized <br />locations, such as fire lanes; vehicles parking in surface guest parking without <br />a sticker, hang -tag, or other identifiers; and vehicles parked longer than any <br />maximum guest parking timeframes allowed; and <br />d. Routine garage inspections to ensure garages are available for vehicle parking. <br />10. The final map must be approved and recorded prior to issuance of a certificate of <br />occupancy or final sign -offs of building permits for the townhome buildings, <br />whichever is first. <br />11. The final map and all improvements required to be made or installed by the <br />subdivider must be in accordance with the design standards and specifications of <br />the Santa Ana Municipal Code and requirements of the State Subdivision Map Act. <br />12. Two copies of the recorded final map and CC&Rs shall be submitted each to the <br />Planning Division, Fire Authority, Building Division, and Public Works Agency within <br />10 days of recordation. <br />13. Prior to issuance of building permits, the Applicant shall submit a construction <br />schedule and staging plan to the Planning Division for review and approval. The <br />plan shall include construction hours, staging areas, parking and site <br />security/screening during Project construction. <br />14. A final detailed amenity plan must be reviewed and approved prior to issuance of <br />any building permits. The plan shall include details on the hardscape design, <br />lighting concepts and outdoor furniture for amenity, plaza, or courtyard areas as <br />well as an installation plan. The exact specifications for these items are subject to <br />the review and approval by the Planning Division. <br />Resolution No. 2025-XX <br />Page 8 of 10 <br />
The URL can be used to link to this page
Your browser does not support the video tag.