My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
INTERIOR DEMOLITION, INC. (4)
Clerk
>
Contracts / Agreements
>
I
>
INTERIOR DEMOLITION, INC. (4)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/29/2025 10:38:24 AM
Creation date
4/29/2025 10:35:05 AM
Metadata
Fields
Template:
Contracts
Company Name
INTERIOR DEMOLITION, INC.
Contract #
A-2025-047-03
Agency
Planning & Building
Council Approval Date
4/15/2025
Expiration Date
4/14/2028
Insurance Exp Date
6/4/2025
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
97
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
i) Required to cap the sewer main as close to the property line as possible. Contractors shall <br /> ensure that all utilities are safe and secure per the utilities' operating procedures. <br /> d) Compacting to 100% density. 1) The property shall be flat and free of debris at the completion <br /> of the project. <br /> 3) Prior to submitting all on-call proposals, the Contractor shall visit the subject project site <br /> (including coordinating with the City for access inside the building), or from public right of way, <br /> and obtain any necessary as-builts to define an appropriate scope of work. Photographs in lieu <br /> of a site visit may be acceptable for certain projects. <br /> 4)All work is to be done in accordance with all applicable federal, state and local regulations, <br /> standards and codes governing demolition and any other trade work done in conjunction with <br /> the demolition, a)The Contractor shall supply all necessary labor, materials, services, <br /> insurance, permits, and equipment to carry out the work in accordance with all applicable <br /> federal, state, and local regulations, <br /> 5) Copies of all demolition permits, water and sewer cap inspection approval and a letter of <br /> completion should be submitted for City's files prior to the Contractor receiving payment. <br /> 0) The Contractor at all times shall keep the Project site free From accumulation of waste <br /> materials or rubbish caused by the Contractor's operations. <br /> 7)At the completion of each trade of the work, and at final completion prior to contractor <br /> submitting the final invoice, Contractor shall remove all waste materials, and rubbish from and <br /> about the project as well as tools, construction equipment, machinery, and surplus materials. <br /> 8) Contractor shall hand deliver a City provided work notice letter to adjacent property owners at <br /> least one week prior to the demolition work. <br /> B. Asbestos Abatement: <br /> 1)The work described herein consists of removal and disposal of ALL asbestos containing <br /> materials (ACM-friable or nonfriable)and subsequent cleaning of the sites in accordance with all <br /> applicable (ederal, state and local regulations, standards and codes governing asbestos and <br /> any other trade work done in conjunction with the abatement. <br /> 2) Results of any testing that identify asbestos containing materials will be provided by the City. <br /> 3) It is the responsibility of the Contractor to determine if any additional asbestos removal is <br /> required in addition to the surveys. <br /> 4) Copies of all notifications must be submitted to City including: a) Abatement contractor's <br /> license, map and/or clear documentation specifying asbestos containing materials abated, <br /> b)Completed waste manifests; and <br />
The URL can be used to link to this page
Your browser does not support the video tag.