My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
INTERIOR DEMOLITION, INC. (4)
Clerk
>
Contracts / Agreements
>
I
>
INTERIOR DEMOLITION, INC. (4)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/29/2025 10:38:24 AM
Creation date
4/29/2025 10:35:05 AM
Metadata
Fields
Template:
Contracts
Company Name
INTERIOR DEMOLITION, INC.
Contract #
A-2025-047-03
Agency
Planning & Building
Council Approval Date
4/15/2025
Expiration Date
4/14/2028
Insurance Exp Date
6/4/2025
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
97
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CITY OF SANTA ANA <br /> ATTACHMENT G <br /> SUBCONTRACTOR [DESIGNATION FORM <br /> Bidder acknowledges and agrees that under Public Contract Code section 4100, at seq., it must clearly set forth <br /> below the name and location of each subcontractor who will perform work or labor or render service to the bidder <br /> in or about the work in an amount in excess of one-half of one percent (0.5%) of bidder's total bid and the kind of <br /> work that each will perform.Furthermore,bidder acknowledges and agrees that under Public Contract Code section <br /> 4100,et seq., if bidder fails to list as to any portion of work,or if bidder lists more than one subcontractor to perform <br /> the same portion of work (i.e. bidder must indicate what portion of the work each subcontractor will perform), bidder <br /> must perform that portion itself or be subjected to penalty under applicable law. <br /> If alternate bids are called for and bidder intends to use subcontractors different from or in addition to those <br /> subcontractors listed for work under the base bid, bidder must list subcontractors that will perform work in an <br /> amount in excess of one half of one percent(0,5%) of bidder's total bid, including alternates. <br /> In case more than one subcontractor is named for the same kind of work, the Contractor is to state the portion of <br /> work that each subcontractor will perform. Bidders or suppliers of materials only do not need to be listed. If further <br /> space is required for the list of proposed subcontractors, additional sheets showing the required information, as <br /> indicated below, shall be attached hereto and made a part of this document. <br /> Listed below is the name of each subcontractor that will perform work, labor, or render services to the undersigned <br /> related to the work of this project.This is to include any subcontractor that will specially fabricate and install a portion <br /> of work according to detailed drawings contained in the plans and specifications in the amount greater than one <br /> half of one percent(.05%)of the contractors total bid. Additional sheets may be attached if needed. <br /> Subcontractor Name: Location: <br /> Portion of Work/Trade: .__ Bid AmountV� --� <br /> Contractor's License Number � w DIR Registration No. <br /> Subcontractor Name: ---_---�— ��� Location: <br /> Portion of Work/Trade: Bid Amount: <br /> Contractor's License No: _ DIR Registration No: <br /> M Contractor will not be subcontracting any portion of work. <br /> THIS FORM MUST BE COMPLETED AND INCLUDED WITH THE PROPOSAL. <br /> PROPOSALS THAT DO NOT CONTAIN THIS FORM WILL BE CONSIDERED NONRESPONSIVE._ <br /> City of Santa Ana RFP No.25-027 Page 40 of 41 I <br />
The URL can be used to link to this page
Your browser does not support the video tag.