My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
INTERIOR DEMOLITION, INC. (4)
Clerk
>
Contracts / Agreements
>
I
>
INTERIOR DEMOLITION, INC. (4)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/29/2025 10:38:24 AM
Creation date
4/29/2025 10:35:05 AM
Metadata
Fields
Template:
Contracts
Company Name
INTERIOR DEMOLITION, INC.
Contract #
A-2025-047-03
Agency
Planning & Building
Council Approval Date
4/15/2025
Expiration Date
4/14/2028
Insurance Exp Date
6/4/2025
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
97
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
INTERIOR DEMOLrTION, INC. FIACI.A <br /> ASBES[OS ABATE ME WT PtAN JOB 9800 GRAPE SI <br /> #2138 LOS ANGELES, CA 90002 <br /> V. <br /> ok Electrical Service and HVAC <br /> i, "rhe Contractor shall provide temporary lighting sources and ensure safe installation <br /> (including ground faulting) of temporary lighting sources and any additional electrical <br /> equipment to be used by the Contractor, in compliance with all applicable electrical <br /> code requirements and Cal/OSHA requirements for temporary electricatsysterriss. <br /> 2. The Contractor shall utilize temporary electrical service or generator: ensure safe <br /> installing of connections and extensions cords (including ground fault inlem.1plion <br /> connections), temporary electrical service, and any additional electrical eqUipment to be <br /> used by the Contractor, in compliance with all applicable eler-tricai code requirements <br /> and CaJ/OSHA requirements for temporary electrical systems, <br /> S. Decontamination Units <br /> 1. One (1)decontamination unit shall be required at each asbestos control <br /> area, It will comply with the foilowing guidelines: <br /> a. Three (3)-stages V decontamination shall be provided, consisting of a <br /> clean room, equipment/dirly room, anc i0iower. This area shall be <br /> constructed of 6--mm polyethylene sheeting and PVC pipe at a <br /> minimum. <br /> b. The floor shall be covered where the docontarnination Lfflit will be <br /> placed with two (2) layers of 6-mm polyethylene prior to set-up of unit, <br /> c A single entry and exit to each work area shall be provided. <br /> d. Each of the three (3)stages shall be separated from each other and <br /> the abatement area by a plastic flap constructed 6-mil poly sheeting <br /> that allow for the flow of air through the clean room and shower room. <br /> 2, The Equipment Room shall be Of sufficient size for storage of aid equipment, <br /> disposal fa(Jlities for contaminated clothing, and allow for removal of such <br /> clothing by employees. <br /> 3, The Clean Roorn ;shall be of adeqLmle size to allow employees to don <br /> abatement gear. Storage facilities for street clothing and respirators will be <br /> provided. Towels will be available in this area, for use after showering. <br /> C. Typical Containment Construction <br /> 1. All materials shall be delivered in the original packages, containers, or bundles <br /> bearing the name of the manufacturor and brand name. <br /> 2. All materials shall be stored off the ground,away from wet or darnP Surfaces. <br /> afndLn(elCOVOr �ufficipntcnOLgtlt ol')r��veft � )mcCeorconlajninatio . <br /> Damaged,dote riorating, of pfeVIOU',ly used materials shall not be used a;-Id <br /> shall be romoved horn the work site and disposed of properly. <br /> '-h e 3 i ,Coritiactm shall shut clown and lock out the I WAC ar--d electrical syvtQw- v, <br /> for the work aroa Trie Corftactorshall provide ternporary lighting sowcez and <br /> ensure safe installation(including ground faulting)of terripoiary lighting soij!ce!5 <br /> and any additional eiectrical eqUipfflEflIt to be LjEjgd by the Contractor in <br /> corlipliance With M applicable electrical code requirements and CaUOSHA <br /> requirements for temporary electrical systems <br /> Z Work areas shall be isolated from non-work areas by installing detireators; and <br /> caution tape 20' beyord entire building perimeter <br /> Si(Inz-z 01,0 be posted '.'it the entrance to each kvokaroa mating a, f <br /> f;i <br />
The URL can be used to link to this page
Your browser does not support the video tag.