Laserfiche WebLink
Fee Schedule Personnel Category _ Flourl Rate <br /> Presented here is the fee Project Manager/Principal Agent $_ 225.00 _ <br /> schedule for J8,G Industries to Project Manager/Principal Agent/Field $ 225.00 <br /> provide the City of Santa Ana Superintendent <br /> with City Wide On-Call <br /> Demolition Services for Safety Director/Officer _ $ 195.00 <br /> Abatement. Field Superintendent $ 215.00 <br /> The hourly rates reflect all Office Manager $ 125.00 <br /> costs and anticipated fees for Operator $ 180-00 <br /> the contract duration, up to a — -- <br /> maximum of three years, Laborer $ 120.00 <br /> All subcontractors will be at Equipment Hourly Rate <br /> cost plus 10%mark-tip. 973 Track Loader(s)�bare rate $ 150.00 <br /> All materials and supplies and Volvo 235 Excavators��(bare rate) $ 160.00 <br /> disposal fees are at cost plus --- --- <br /> 10% Volvo 480 Excavator(s)—bucket(bare $ 215.00 <br /> rate) <br /> Support vehicles are included RMG 100 Portable Crusher $ 725.00 <br /> in hourly rate for personnel <br /> category. Attachments:Excavator <br /> Rotating Grapple $ 76.00 <br /> Paddle Wheel $ 40.00 <br /> Breaker $ 105.00 <br /> Pulverizer $ 140.00 <br /> 31d Member Shear $ 150.00 <br /> 2"d Member Shear $ 225.00 <br /> Bobcat Sid Steer Loader(s)—bucket $ 50.00 <br /> bare) <br /> Attachments: <br /> Breaker $ 55.00 <br /> Shear $ 85.00 <br /> Power Sweeper $ 60.00 <br /> Forklift $ 4501da <br /> 1500-2000 Gallon Water Truck $ 4501day <br /> Trucking by G.0 Rodriguez MBE <br /> Lo Bed Charges Current rental <br /> _ rates <br /> Hi-side End Dump Current rental <br /> rates <br /> Lo-side End Dump current rental <br /> — rates <br />