My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PENCO ENGINEERING 2 - 2008
Clerk
>
Contracts / Agreements
>
P
>
PENCO ENGINEERING 2 - 2008
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/25/2020 11:17:51 AM
Creation date
9/22/2008 2:01:41 PM
Metadata
Fields
Template:
Contracts
Company Name
PENCO ENGINEERING
Contract #
A-2008-218
Agency
PUBLIC WORKS
Council Approval Date
8/18/2008
Insurance Exp Date
7/21/2018
Destruction Year
0
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
59
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SCOPE OF SERVICES <br />SURVEYING SERVICES <br />1 MILE STREET REHABILITATION <br />SANTA ANA, CALIFORNIA <br />A. PROJECT LIMITS SHALL INCLUDE: <br />1. Street "A" from 200' west of 1St Street to 200' east of 4th Street; <br />2. Street "A" topo shall include a 300' wide strip centered about the <br />street centerline; <br />3. All additional side streets (approximately 4 each) shall include <br />topography 300' north and or south along existing streets, <br />4. Topographic features shall include finished surface elevations at a <br />10' grid at each of the centerline intersections included within the <br />Street "A" topo limits. <br />DELIVERABLES: <br />1. Aerial ground control targets will be placed seven (7) working days <br />after execution of contract; <br />2. Digital Raster Image files (.tif) shall be delivered seventeen (17) <br />working days after execution of contract. <br />3. Survey field measurements will be completed thirty (30) working <br />days after execution of contract; <br />4. Aerial map compilation shall be completed thirty (30) working <br />days after execution of contract; <br />5. Completed Topographic Survey Map and digital files will be <br />completed forty five (45) working days after execution of contract. <br />6. Deliver hard copy plots, stamped and signed by a Professional <br />Land Surveyor <br />7. Deliver electronic files in Micro -Station V8 format. <br />
The URL can be used to link to this page
Your browser does not support the video tag.