Laserfiche WebLink
<br />AUGUST 25, 2008 <br />PAGE20F3 <br /> <br />7. Prior to issuance of a certificate of occupancy, the applicant <br />and owners of the adjacent industrial buildings shall enter into <br />an agreement to reserve a minimum of 12 parking spaces for use <br />on Sunday by the industrial tenants. <br /> <br />8. After the issuance of a certificate of occupancy, quarterly <br />meetings between the church, adj acent business operators and <br />City shall be held to discuss and resolve issues related to the <br />operation of the church. <br /> <br />B. Public Works Agenc~ <br /> <br />1. Submit a copy of the lease agreement. <br /> <br />2. Revise the site plan to eliminate the proposed driveways on <br />Fifth Street and Fairview Street; utilize the existing <br />driveways, which will require an ingress-egress easement with <br />the adjacent property. <br /> <br />3. <br /> <br />Revise the <br />( including <br />the project <br /> <br />site plan <br />crack repair <br />frontage. <br /> <br />to depict and <br />as necessary) <br /> <br />note the <br />of Fifth <br /> <br />slurry <br />Street <br /> <br />seal <br />along <br /> <br />4. Revise the site plan to note that a reciprocal drainage <br />easement will be required to cover cross-lot drainage. <br /> <br />5. Revise the site plan to depict and note, if any, new points of <br />connection for utility services required to service the site. <br /> <br />6. Revise the site plan to depict and note the reconstruction of <br />the easternmost existing driveway to have the following <br />minimum dimensions, W=A=28' and X=4' . <br /> <br />7. Revise the site plan to correct note #4 on sheet #A1.2 to read <br />"Driveway" instead of "H.C. Ramp". <br /> <br />8 . <br /> <br />Revise the site plan to depict the <br />cuI verts to drain the site safely. <br />street must be directed beneath to <br />through the curb. <br /> <br />construction of sidewalk <br />Drainage routed to the <br />drain the sidewalk and <br /> <br />9. <br /> <br />Revise the site plan to note the installation <br />inlets, with filters to remove hydrocarbons, <br />trash, before discharging into storm drain <br />This applies to the proposed parking lot area. <br /> <br />of storm water <br />sediment, and <br />and/or street. <br /> <br />75C-75 <br /> <br /> <br />-- <br /> <br />