Laserfiche WebLink
Environmental Checklist <br />CEQA Compliance <br /> Less than <br /> Significant <br /> Potentially with Less Than <br /> Significant Mitigation Significant No <br />Issues 8~ Supporting Information Sources Impact Incorporated Impact Impact <br />B. Exceed, either individually or cumulatively, a level ^ ^ ^ <br />of service standard established by the county <br />congestion management agency for designated <br />roads or highways? <br />C. Result in a change in air traffic patterns, including ^ <br />either an increase in traffic levels or a change in <br />location that results in substantial safety risks? <br />D. Substantially increase hazards to a design feature ^ <br />(e.g., sharp curves or dangerous intersections) or <br />incompatible uses (e.g., farm equipment)? <br />E. Result in inadequate emergency access? ^ <br />F. Result in inadequate parking capacity? ^ <br />G. Conflict with adopted policies supporting ^ <br />alternative transportation (e.g., bus turnouts, <br />bicycle racks)? <br />^ ^ <br />^ ^ <br /> <br />XVI. Utilities and Service Systems <br />A. Exceed wastewater treatment requirements of the ^ <br />applicable Regional Water Quality Control Board? <br />B. Require or result in the construction of new water ^ <br />or wastewater treatment facilities or expansion of <br />existing facilities, the construction of which could <br />cause significant environmental effects? <br />C. Require or result in the construction of new storm ^ <br />water drainage facilities or expansion of existing <br />facilities, the construction of which could cause <br />significant environmental effects? <br />D. Are sufficient water supplies available to serve the ^ <br />project from existing entitlements and resources or <br />are new or expanded entitlements needed? <br />E. Result in the determination by the wastewater ^ <br />treatment provider which serves or may serve the <br />project that it has adequate capacity to serve the <br />project's projected demand in addition to the <br />provider's existing commitments? <br /> <br />^ ^ <br />® ^ ^ <br />^ ^ <br />^ ^ <br />^ ^ <br />^ ^ <br />^ ^ <br />^ ^ <br />75C-92 <br />