My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
25B - QUIET ZONE RAILROAD
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2008
>
10/20/2008
>
25B - QUIET ZONE RAILROAD
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/3/2012 4:27:08 PM
Creation date
10/17/2008 12:17:28 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Item #
25B
Date
10/20/2008
Destruction Year
2013
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
41
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
6. To perform all work within the limits of the CITY right-of-way in a good and <br />workmanlike manner, and in accordance with plans and specifications approved <br />by the CITY. SCRRA's construction contractor shall obtain an encroachment <br />permit, at no fee to either SCRRA or it's contractor, from the City for the work <br />performed in the City's right of way. Changes or modifications during construction <br />that affect the CITY right-of-way shall be submitted to the CITY for written <br />approval. SCRRA shall conduct all of its activities in association with the <br />PROJECT in a good and competent manner and in compliance with all applicable <br />federal, state and local rules and regulations and SCRRA's applicable design <br />criteria, standards, policies, practices, and guidelines specifically including <br />SCRRA's Quiet Zone Implementation Guidelines and Procedures, attached as <br />Exhibit C. <br />7. To make all necessary arrangements for the protection, relocation or removal of <br />any public or private utility facility that conflicts with the PROJECT. <br />8. To obtain, prior to commencing construction work, and comply with any and all <br />approvals, permits, licenses and other authorizations required by applicable laws, <br />regulations, rules and ordinances, including obtaining CPUC approval of the <br />PROJECT plans. <br />9. To maintain, repair and renew each crossing area between lines two (2) feet <br />outside of the rails of each track. When two or more tracks are involved, SCRRA <br />shall maintain and repair, at its expense, the area between the tracks where the <br />distance between the centerlines of tracks is fifteen (15) feet or less measured at <br />the centerline of the highway, normal to the tracks. This work shall be done <br />pursuant to CPUC General Order 72-B. <br />10. To maintain, repair, and renew the railroad automatic warning devices ,pedestrian <br />warning devices, vehicle intrusion detection devices, emergency exit swing gates, <br />detectible warning tactile strips, striping between the warning devices and <br />channelization devices for pedestrians (fencing and hand railing). <br />SECTION II <br />CITY AGREES: <br />To conduct timely review of SCRRA's milestone plan submittals (30%, 60%, and <br />100%, and Final Design), timely review of changes to the plans constructed on <br />CITY right of way or jurisdiction during construction, timely submittal of SCRRA <br />traffic pre-emption timing requests, timely review and approval of final SCRRA <br />construction plans, timely granting of encroachment permits to SCRRA and its <br />construction contractors (upon request by the construction contractor in order to <br />not create any construction related delays to the Project), and timely granting of <br />grade crossing closure requests including traffic detour plans to perform the work <br />OCTA Safety Enhancement Project for City of Tustin Page 4 of 14 Draft Construction and Maintenance Agreement <br />City of Santa Ana 09/29/08 <br />25B-22 <br />
The URL can be used to link to this page
Your browser does not support the video tag.