My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
25R - GROUND LEASE WITH DELHI
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2008
>
12/01/2008
>
25R - GROUND LEASE WITH DELHI
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/3/2012 4:26:01 PM
Creation date
11/25/2008 3:56:32 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Item #
25R
Date
12/1/2008
Destruction Year
2013
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
30
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ARTICLE 5 <br />CONSTRUCTION BY TENANT <br />Section 5.01. Dut~to Construct <br />Tenant shall, in collaboration with Landlord, construct or cause to be constructed on the Premises, a <br />Community Center in the manner and according to the terms and conditions specified in this Article. <br />Section 5.02. Requirement of Landlord's Written Approval <br />No structure or other improvement of any kind shall be constructed on the Premises unless and until <br />the plans, specifications, and proposed location of that structure or improvement have been approved in <br />writing by Landlord. Furthermore, no structure or other improvement shall be constructed on the Premises that <br />does not comply with plans, specifications, and locations approved in writing by Landlord. <br />Section 5.03. RESERVED <br />Section 5.04. RESERVED <br />Section 5.05. RESERVED <br />Section 5.06. RESERVED <br />Section 5.07. RESERVED <br />Section 5.08. RESERVED <br />Section 5.09. Time for Completion <br />Tenant, together with Landlord, shall cause construction of the Community Center to be commenced in <br />accordance with the schedule for completion, provided by the program manager, and shall cause construction <br />of the Community Center to be diligently pursued without unnecessary interruption, and shall cause the <br />Community Center to be completed and ready for occupancy not later than three years after commencement of <br />its construction. The time of performance by either party hereunder shall be extended where delays are due to <br />war; insurrection; strikes; lockouts; Labor disputes; riots; floods; earthquakes; fires; casualties; acts of God; acts of <br />the public enemy; epidemics; quarantine restrictions; freight embargoes; lack of transportation; governmental <br />restrictions or priority; litigation including, but not limited to, litigation challenging the validity of this transaction <br />or any element thereof (except condemnation); severe weather; inability to secure necessary labor, materials or <br />tools; delays of any contractor, subcontractor, or suppl ies; acts of the other party; acts or failure to act of the City <br />or any other public or governmental agency or entity {other than acts or failure to act of the City shall not excuse <br />performance by the City); or any other cause beyond the control, or without the fault of the party claiming an <br />extension of time to perform; provided that notice by the party claiming such extension is sent to the other party <br />within thirty (30) days of the commencement of the cause. Any such extension shall be for the duration of the <br />cause of the delay. <br />Section 5.10. RESERVED. <br />Section 5.11. RESERVED <br />25R-9 <br />
The URL can be used to link to this page
Your browser does not support the video tag.