Laserfiche WebLink
3.] ~ ~y3 ~ a -e <br />J ~ S <br />Mc[7ouatd, Sotaar Nt. Pua. Iuc <br />December 10, 2008 <br />Nabil B. Saba P.E., <br />Principal Civii Engineer Water Resources Division <br />City of Santa Ana <br />Public Works Agency <br />220 S. Daisy Ave <br />Santa Ana, Califomia 92703 <br />Subject: AiE Proposal -City of Santa Ana Public Works Agency <br />Repiacement Ladder at Maxine Pump Station <br />We are pleased to present this proposal for architectural/engineering services for <br />the subject project. Based on the information provided by your office, we <br />developed the fallowing project description and scope of work. <br />Project Description: <br />The project consists of providing a replacement steel ladder at the Maxine Pump <br />station for the City of Santa Ana, Califomia. The project scope is the installation <br />of a new steel ladder with amid-height platform to be anchored to the existing <br />concrete retaining wall. <br />Exhibit A -Scope of Work: <br />AIE will provide: <br />1. Field investigation as required for the Design. <br />2. Coordinate with consultants to finalize the scope and design of project. <br />3. Design and Constnaction Documents for Architectural (no specifications <br />required) <br />4, Prepare Structural Engineering design calculations and construction <br />documents, for the project in conformance with the governing building <br />code. <br />5. Provide copies of the structural calculations and drawings, stamped and <br />signed, for submittal to the City of Santa Ana for review and comment.. <br />3575 Long Beach Boulevard <br />Long Ba ch, CA 90807 <br />Phone 562 427 5007 <br />Fax 562 427 3007 <br />Email insp@ArchitectsMSP.com <br />