My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Agenda Packet_2025-05-06
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2025
>
05/06/2025
>
Agenda Packet_2025-05-06
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/1/2025 3:09:52 PM
Creation date
5/1/2025 10:32:01 AM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Clerk of the Council
Date
5/6/2025
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
1764
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Attachment A <br />ELEMENT <br />EJ <br />IMPLEMENTATION ACTION <br />AGENCY <br />TIME FRAME <br />2024 UPDATE <br />Mobility 3.2 <br />No <br />Circulation connectivity. Close the <br />PWA / <br />Ongoing <br />Continued to analyze Class 1-4 options <br />Golden Loop network between <br />PRCSA <br />in an effort to complete the Golden <br />Memory Lane and Santiago Creek <br />Loop Network. <br />and between Santiago Park and <br />Lincoln Avenue/Santiago Street. <br />Mobility 3.3 <br />No <br />Pedestrian accessibility. <br />PWA <br />Ongoing <br />PWA reviewed all submitted land <br />Implement the City ADA Transition <br />development projects to determine <br />Plan to cost-effectively enhance <br />whether proposed private <br />pedestrian accessibility, with <br />improvements caused additional need <br />guidance from the Sidewalk <br />for pedestrian facilities, and where <br />Connectivity Plan. <br />applicable and feasible, required <br />improvement such as new sidewalk and <br />access ramps. <br />Mobility 3.4 <br />No <br />Pedestrian opportunity zones. <br />PWA / PBA <br />2022-2035 <br />PWA and PBA are working with the <br />Prepare public realm plans in <br />selected firm Torti Gallas and Partners <br />pedestrian opportunity zones <br />to create Public Realm Plans for 5 focus <br />areas in the City; South Main Street, <br />Grand Avenue and 17th Street, West <br />Santa Ana Boulevard, 55 Freeway and <br />Dyer Road, and South Bristol Street. <br />The project is expected to be fully <br />completed March 2026. <br />Mobility 3.5 <br />Yes <br />Safe routes to schools and parks. <br />PWA / <br />Ongoing <br />Pursuing funding for SRTS <br />Develop and pursue <br />PRCSA <br />improvements. SRTP will start in 2025. <br />implementation of a Safe Routes <br />to School Plan and a Safe Routes <br />to Parks Plan <br />Mobility 3.6 <br />No <br />Drinking water access. Create a <br />PWA <br />2022-2035 <br />Continued to expand the installation of <br />network of public water fountains <br />drinking fountains and bottle filling <br />/ bottle fill stations that promote <br />stations throughout city parks and <br />the City's award -winning water, <br />facilities. <br />conservation, and substitution of <br />City Council 7 — 85 5/6/2025 51 <br />
The URL can be used to link to this page
Your browser does not support the video tag.