My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Agenda Packet_2025-05-06
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2025
>
05/06/2025
>
Agenda Packet_2025-05-06
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/1/2025 3:09:52 PM
Creation date
5/1/2025 10:32:01 AM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Clerk of the Council
Date
5/6/2025
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
1764
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Attachment A <br />ELEMENT <br />EJ <br />IMPLEMENTATION ACTION <br />AGENCY <br />TIME FRAME <br />2024 UPDATE <br />Drain Master Plan top 10 <br />recommended project. The City also <br />continued to make progress on a <br />Stormwater Project Master Plan, which <br />includes a detailed analysis of the City <br />to identify optimal locations for <br />stormwater projects. <br />Public Services <br />No <br />Secondary use of City -owned <br />PWA <br />2023 <br />Work continues to identify lots for <br />1.8 <br />infrastructure. Identify City water <br />acquisition to accommodate recreation <br />facilities that can accommodate <br />and/or public art amenities. <br />recreation and/or public art <br />amenities <br />Public Services <br />No <br />Alternative energy for water <br />PWA <br />2022 <br />PWA Water Resources secured a grant <br />1.9 <br />resources. Identify projects from <br />for alternative energy source. <br />the completed Alternative Energy <br />Continues to work in securing <br />Feasibility Study for water <br />consulting firm/s for design services <br />resources, to be included in the <br />Capital Improvement Plan. <br />Public Services <br />No <br />Comprehensive Safe Schools <br />PWA <br />2030 <br />Continued to implement elements of <br />2.9 <br />Plan. Coordinate with local school <br />the existing Safe Routes to School Plan <br />districts on an ongoing basis to <br />as funding becomes available. <br />assist in the review and update of <br />a Comprehensive Safe School Plan <br />for each school in Santa Ana. <br />Public Services <br />No <br />Urban vehicle study. Work with <br />PD / OCFA <br />Ongoing <br />The City's Development Review <br />2.16 <br />emergency responders to ensure <br />Committee continues to review <br />that vehicles can efficiently <br />proposed development to ensure <br />navigate an increasingly urban <br />compliance with emergency vehicle <br />environment with narrower lanes <br />access standards. <br />and tighter turn radii. Evaluate all <br />new development projects to <br />ensure emergency vehicle <br />accessibility. <br />City Council 7 — 105 5/6/2025 71 <br />
The URL can be used to link to this page
Your browser does not support the video tag.