My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Agenda Packet_2025-05-06
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2025
>
05/06/2025
>
Agenda Packet_2025-05-06
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/1/2025 3:09:52 PM
Creation date
5/1/2025 10:32:01 AM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Clerk of the Council
Date
5/6/2025
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
1764
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Attachment A <br />ELEMENT <br />EJ <br />IMPLEMENTATION ACTION <br />AGENCY <br />TIME FRAME <br />2024 UPDATE <br />development stormwater <br />Management Plan (WQMP) for review <br />infrastructure to reduce runoff <br />and approval. The WQMP includes a <br />and encourage groundwater <br />variety of stormwater Best <br />recharge. <br />Management Practices (BMPs) to <br />retain or treat stormwater runoff on - <br />site and ongoing maintenance <br />requirements. <br />In 2024, the City verified installation of <br />stormwater infiltration or treatment <br />BMPs at twenty-one (21) new <br />development and significant <br />redevelopment projects, totaling 51.56- <br />acres of treatment area. <br />Safety 1.7 <br />No <br />Storm Drains. Continue to <br />PWA <br />Ongoing <br />The City's Public Works Agency reviews <br />maintain and seek opportunities <br />all submitted land development <br />to upgrade the City's storm drain <br />projects to determine whether <br />systems, where needed, with an <br />proposed private improvements create <br />emphasis on historical flooding <br />increased stormwater runoff volumes. <br />areas. This includes regular <br />Where applicable and feasible, the City <br />maintenance and cleaning of <br />requires on -site retention and/or public <br />storm drains and other flood <br />stormdrain system upgrades. <br />control structures so that <br />In 2024, the City completed final design <br />stormwater can be effectively <br />of the Rousselle Street Flood Protection <br />conveyed, and upgrading the <br />Project, which is listed in the 2018 <br />storm drain system where it is <br />Storm Drain Master Plan as one of the <br />known to be undersized. <br />Top 10 Recommended Capital <br />Improvement Projects. The Project is <br />anticipated to start construction in <br />April 2025. The City also removed <br />approximately 84-tons of material from <br />the stormdrain system. <br />Safety 1.10 <br />No <br />Climate resiliency. Explore the <br />PBA / PWA <br />2022 - 2024 <br />The City's Public Works Agency will <br />development of a climate <br />build in an assessment of a climate <br />City Council 7 —110 5/6/2025 76 <br />
The URL can be used to link to this page
Your browser does not support the video tag.