Laserfiche WebLink
unstable and exposed hills or slopes. (DEIR Section 4.6.3: Effects Found to Have No <br />Impact) <br />• Implementation of the Transit Zoning Code would not violate water quality standards, <br />waste discharge, or otherwise substantially degrade water quality. (Impact 4.6-1: Less <br />Than Significant with mitigation) <br />• The majority of the Transit Zoning Code (SD 84A and SD 84B) area is already <br />developed and because the project area is not used for groundwater recharge, the <br />operation of future development under the proposed project would not interfere <br />substantially with groundwater recharge. (Impact 4.6-2: Less Than Significant without <br />mitigation with mitigation) <br />• Development under the Transit Zoning Code (SD 84A and SD 84B) could alter the <br />existing drainage pattern of the area and potentially result in erosion and siltation. <br />(Impact 4.6-3: Less Than Significant) <br />• Future development in the Transit Zoning Code (SD 84A and SD 84B) could alter the <br />existing drainage pattern and potentially result in increased downstream flooding <br />through the addition of impervious surfaces, or exceeding the capacity of existing or <br />planned stormwater drainage systems. (Impact 4.6-4: Less Than Significant with <br />mitigation) <br />TZC EIR Mitigation Measures <br />MM4.6-1 In order to comply with the current version of the Drainage Area Master Plan (DAMP), <br />future development projects in the Transit Zoning Code (SD 84A and SD 84B) area shall <br />prepare Storm Drain Plans, Stormwater Pollution Prevention Plans (SWPPP), and Water <br />Quality Management Plans (WQMP) conforming to the current National Pollutant Discharge <br />Elimination System (NPDES) requirements, prepared by a Licensed Civil Engineer or <br />Environmental Engineer, shall be submitted to the Public Works Agency for review and <br />approval. <br />a. A SWPPP shall be prepared and updated as needed during the course of construction to <br />satisfy the requirements of each phase of the development. The plan shall incorporate all <br />necessary Best Management Practices (BMPs) and other City requirements to eliminate <br />polluted runoff until all construction work for the project is completed. The SWPPP shall include <br />treatment and disposal of all dewatering operation flows, and for nuisance flows during <br />construction. The SWPPP may include, but would not necessarily be limited to, the following <br />applicable measures: <br />o Minimum required pavement widths for residential streets needed to comply with all <br />zoning and applicable ordinances <br />o Use permeable materials for private sidewalks, driveways, parking lots, or interior <br />roadway surfaces <br />o Reduce the overall imperviousness associated with parking lots by using pervious <br />materials in spillover parking areas <br />o Direct rooftop runoff to pervious areas and avoid routing rooftop runoff to the roadway or <br />the stormwater conveyance system <br />o Biofilters including vegetated swales and strips <br />o Extended/dry detention basins <br />o Infiltration basin <br />o Infiltration trenches or vaults <br />o Catch basin inserts <br />January 2025 34 Environmental Analysis <br />