Laserfiche WebLink
MARCH 23, 2009 <br />PAGE 7 OF 17 <br />36. Prior to commencement of construction activities, the project <br />developer shall identify to the City a construction relations <br />officer to act as a community liaison concerning on-site <br />activity, including resolution of issues related to dust <br />generation from grading/paving activities. A publicly visible <br />sign shall be posted with the name of construction relations <br />officer and a telephone number. <br />37. During finish work, the construction contractor shall ensure <br />the minimization of ROG emissions. Building plans for the <br />project shall specify and require the use of pre-coated <br />building materials, use of high pressure-low volume (HPLV) <br />paint applicators with 50 percent efficiency, and use of lower <br />volatility paint not to exceed 100 grams of ROG per liter. <br />38. During construction and grading activities, the developer's <br />construction contractor shall comply with the measures set <br />forth in the Storm Water Pollution Prevention Plan (SWPPP) to <br />ensure that airborne dust is kept to a minimum. <br />39. Prior to issuance of building permits and to the extent <br />feasible, building plans for the proposed project shall <br />reflect the use of the following measures. <br />• Use low-polluting high energy-efficient appliances <br />• Install solar panels on roofs to supply electricity for <br />heating and cooling <br />• Use double-paned windows to reduce thermal loss <br />• Install automatic lighting on/off controls and energy- <br />efficient lighting <br />• Use light colored roofing materials in new construction to <br />deflect heat away from buildings. <br />40. During grading operations, special handling of on-site soils <br />shall be required due to the high moisture content of the <br />soils, which is well above optimum moisture conditions. The <br />City of Santa Ana shall monitor the grading contractor to <br />ensure stabilization of the soils during grading prior to <br />placing and compacting fill soils over wet sub-grade soils, as <br />recommended in the geotechnical investigation prepared by <br />Geotechnical Professionals, Inc. <br />75A-101 <br />