My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
75A - PH MACARTHUR PLACE SOUTH - SKYLINE TOWERS
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2009
>
05/04/2009
>
75A - PH MACARTHUR PLACE SOUTH - SKYLINE TOWERS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/3/2012 4:21:17 PM
Creation date
4/29/2009 12:56:56 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Item #
75A
Date
5/4/2009
Destruction Year
2014
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
164
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
MARCH 23, 2009 <br />PAGE 14 OF 17 <br />79. Prior to issuance of a building permit, the project developer <br />shall comply with Senate Bill 50 and pay applicable school <br />impact fees. Currently, the Santa Ana Unified School <br />District's adopted Fee Justification for residential <br />development is $2.14 per square foot and $0.33 per square foot <br />for commercial development. <br />80. Prior to issuance of a building permit, the project developer <br />shall ensure that the appropriate park Acquisition and <br />Development Fee and parkland dedication or in-lieu payments <br />have been made. <br />81. Prior to issuance of building permits, the project developer <br />shall submit a Construction Phasing Plan to Santa Ana Fire <br />Department. The plan must be consistent with the Fire <br />Department Fire Code requirements and must show that emergency <br />access to the construction site is adequate. <br />82. Prior to issuance of building permits, the project developer <br />shall provide evidence to the Santa Ana Fire Department that <br />the proposed fire protection and life saving systems <br />incorporated in the project are adequate. <br />83. Prior to issuance of building permits, the project developer <br />shall submit the final design of the project, including fire <br />sprinklers system design to the Santa Ana Fire Department for <br />approval. <br />84. Prior to issuance of building permits, the project developer <br />shall coordinate with the Santa Ana Fire Department and the <br />Santa Ana Police Department regarding possible radio <br />interference and installation of radio repeaters on a tower <br />rooftop. <br />85. Prior to issuance of building occupancy permits, the project <br />developer in cooperation with the City of Santa Ana, shall <br />provide for the restriping of the outside southbound through <br />lane at the intersection of Main Street and Sunflower to a <br />shared through and right turn lane. <br />86. Prior to issuance of building occupancy permits, the project <br />developer in cooperation with the City of Santa Ana, shall <br />provide for the restriping the shared through right-turn lane <br />at Hutton Centre Drive and MacArthur Boulevard to provide an <br />exclusive through lane and construct a second northbound right <br />turn lane for the northbound traffic. <br />75A-108 <br />
The URL can be used to link to this page
Your browser does not support the video tag.