My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
75A - PH MACARTHUR PLACE SOUTH - SKYLINE TOWERS
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2009
>
05/04/2009
>
75A - PH MACARTHUR PLACE SOUTH - SKYLINE TOWERS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/3/2012 4:21:17 PM
Creation date
4/29/2009 12:56:56 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Item #
75A
Date
5/4/2009
Destruction Year
2014
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
164
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
MARCH 23, 2009 <br />PAGE 6 OF 17 <br />33. As required by the AELUP, prior to issuance of the certificate <br />of use and occupancy, the City shall ensure that the sales <br />office for the residential unit posts a conspicuous sign <br />informing potential buyers to the presence of the airport. <br />The notice shall be in the same language as the need notice. <br />34. Prior to the issuance of a building permit, the project <br />developer shall provide evidence to the Planning Manager that <br />an FAA "NO Hazard" determination has been secured for the <br />operation of the construction cranes. The project developer <br />shall demonstrate compliance with any conditions imposed by <br />the FAA. <br />35. During construction, the contractor shall be required to <br />comply with SCAQMD Fugitive Dust Rule 403 to suppress dust <br />generated by construction operations. To ensure compliance <br />with SCAQMD Fugitive Dust Rule 403, grading plans and <br />demolition plans for the proposed project shall reflect the <br />following notes: <br />• All materials excavated or graded shall be sufficiently <br />watered to prevent excessive amounts of dust. Watering with <br />complete coverage shall occur at least twice daily, once in <br />the late morning and once after work is done for the day. <br />• All clearing and earthwork activities shall cease during <br />periods of high winds (winds greater than 25 mph averaged <br />over one hour) or during Stage 1 or Stage 2 smog episodes. <br />• Internal roadways and project site entry and exit points <br />shall be cleaned at the end of each day by the project <br />developer. Dust and debris from construction activities <br />that migrates or is carried onto MacArthur Boulevard or Main <br />Street adjacent to the project site shall also be cleaned <br />each day. <br />• All material transported off-site shall either be <br />sufficiently watered or securely covered to prevent <br />excessive amounts of dust. Haul trucks leaving the site <br />shall have a minimum freeboard distance of 12-inches. <br />• Construction equipment leaving the project site shall be <br />wheel washed. <br />75A-119 <br />
The URL can be used to link to this page
Your browser does not support the video tag.