Laserfiche WebLink
RESOLUTION 2009 <br />PROPOSED <br />REVENUE <br />FY 08 -09 <br />FY 09 -10 <br />ACCOUNT <br />DEPARTMENT/MISCELLANEOUS FEE OR SERVICE <br />UNIT <br />FEES <br />FEES <br />SECTION IX <br />PLANNING & BUILDING AGENCY <br />598 volts or less, 1200 amps and over. <br />Each Meter <br />154.50 <br />159.15 <br />5913 <br />9) <br />Signs and high- potential gas tube lighting, each <br />Each <br />30.70 <br />31.60 <br />Note: This shall include all necessary control equipment <br />5913 <br />10) <br />Swimming pool, fountain, spas, each <br />Each <br />67.90 <br />69.90 <br />5913 <br />11) <br />Above ground spas <br />Each <br />21.85 <br />22.50 <br />5913 <br />12) <br />Temporary power- construction: <br />For services supplying a temporary power pole, <br />pedestal or piggyback <br />Each <br />53.35 <br />54.95 <br />For a system of distribution and utilization of poles <br />for temporary construction power, each pole <br />Each Pole <br />10.15 <br />10.45 <br />5913 <br />13) <br />Temporary construction lighting: <br />500 lamps or less <br />4.60 <br />4.70 <br />Over 500 lamps <br />8.00 <br />8.20 <br />5913 <br />14) <br />Temporary services: <br />At the time of application for temporary power, the owner <br />shall post a $1,000.00 cash or cashier's check conforming to the <br />Santa Ana Municipal Code Section 8 -1768 for each service <br />meter. This deposit shall be released upon request after the <br />Certificate of Completion or Certificate of Occupancy is issued. <br />Temporary electric service prior to final approval or <br />occupancy, each meter <br />Each Meter <br />193.00 <br />198.80 <br />Temporary work with service, each meter <br />Each Meter <br />27.00 <br />27.80 <br />5913 <br />15) <br />Lighting standards: <br />With one (1) fixture each <br />Each <br />10.15 <br />10.45 <br />Each additional fixture on the same standard <br />Each <br />2.95 <br />3.00 <br />5913 <br />16) <br />Time clock or photo electric cell, each <br />Each <br />8.00 <br />8.20 <br />5913 <br />17) <br />Radiant ceiling heat per room <br />Per Room <br />10.15 <br />10.45 <br />5913 <br />18) <br />Power apparatus: generators, motors, transformers, <br />rectifiers, synchronous converters, capacitors, <br />industrial heating, cooking or baking equipment, and <br />other apparatus as follows: <br />(Ratings - horsepower (HP), kilowatts (KW), and <br />Kilovolt amps (KVA)) <br />40 <br />75B -60 <br />