My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
FULL PACKET_2009-06-01
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2009
>
06/01/2009
>
FULL PACKET_2009-06-01
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/23/2016 5:57:55 PM
Creation date
6/11/2009 9:52:08 AM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Date
6/1/2009
Destruction Year
2014
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
540
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
RESOLUTION 2009 <br />REVENUE <br />ACCOUNT <br />SECTION IX <br />5914 <br />5914 <br />5914 <br />5914 <br />5914 <br />5914 <br />5914 <br />5914 <br />5914 <br />5914 <br />5914 <br />DEPARTMENT/MISCELLANEOUS FEE OR SERVICE <br />PLANNING & BUILDING AGENCY <br />Between 1,501 (42.1m3 ) and 3,000 cu. ft. (84m3) <br />More than 3,000 cu. ft. (84m) <br />plus per 1,000 cu. ft. (28m) or fraction <br />thereof over 3,000 cu. ft. (84m) <br />4) Self- contained water heater (residential type) <br />5) Water heater (commercial type) <br />6) Heat exchanger <br />7) Water piping replacement, each 100 feet <br />8) Gas piping service, 1 -5 outlets <br />9) Backflow prevention device <br />10) For each appliance or piece of equipment regulated <br />by this code for which no fee is listed <br />11) Inspections outside of normal business hours <br />(4 hour minimum charge for Holidays, Saturday <br />and Sunday inspections) <br />12) Re- inspection fee assessed under provisions of the <br />Building Code <br />13) Inspections for which no fee is specifically indicated <br />(minimum charge - one (1) hour) <br />14) Additional plan review required by changes, <br />additions, or revisions to approved plans (minimum <br />charge - one (1)hour) <br />SOLAR PLAN CHECK FEES <br />Whenever solar plans are required by the Building Official, <br />plan check fees shall be 65% of the solar permit fee and <br />shall be paid at the time of submitting plans. <br />49 <br />75B -69 <br />PROPOSED <br />FY 08 -09 <br />FY 09 -10 <br />UNIT <br />FEES <br />FEES <br />15.35 <br />15.80 <br />15.35 <br />15.80 <br />1.60 <br />1.65 <br />Each <br />9.10 <br />9.35 <br />Each <br />46.30 <br />47.65 <br />Each <br />9.10 <br />9.35 <br />Each <br />18.20 <br />18.75 <br />Each <br />18.20 <br />18.75 <br />Each <br />9.10 <br />9.35 <br />Each <br />9.10 <br />9.35 <br />Per Hour <br />77.00 <br />79.32 <br />Per Hour <br />77.00 <br />79.32 <br />Per Hour <br />77.00 <br />79.32 <br />Per Hour <br />77.00 <br />79.32 <br />
The URL can be used to link to this page
Your browser does not support the video tag.