Laserfiche WebLink
COST ESTIMATE <br />Orange County Grade Crossing Safety Improvement Program <br />09616 -01 <br />ADA DETACTABLE WARNING SURFACE <br />SF <br />26 <br />$45 <br />$1,170 <br />2890 -11 <br />TRAFFIC SIGNAL IMPROVEMENTS- SANTA ANA BOULEVARD <br />LS <br />i <br />$141,900 <br />$141,900 <br />8000 -01 <br />RAILROAD SIGNAL AND RR ACTIVE WARNING DEVICES- BY OTHERS <br />LS <br />11 <br />04,000 <br />$504,000 <br />CONSTRUCTION <br />SUBTOTAL <br />$855,954 <br />CONTINGENCY <br />$85,595 <br />Schedule 34B <br />- City of Santa Ana, Santa Ana Boulevard Crossing <br />TOTAL <br />$941,549 <br />01570 -01 <br />MAINTENANCE AND PROTECTION OF TRAFFIC <br />LS <br />two <br />1 <br />$10,000 <br />$10,000 <br />02050 -07 <br />REMOVE EXISTING CURB AND GUTTER <br />LF <br />20 <br />$25 <br />$500 <br />02050 -09 <br />REMOVE EXISTING CONCRETE PAVEMENT <br />SF <br />120 <br />$5 <br />$600 <br />02459 -02 <br />REHAB EXISTING GRADE CROSSING PANELS BY OTHERS <br />TF <br />24 <br />$1,200 <br />$28,800 <br />02513 -04 <br />7" AC PAVEMENT <br />SF <br />766 <br />$11 <br />$8,426 <br />02513 -05 <br />VARIABLE A.C. PAVEMENT AT END OF CROSSING PANELS PER SCRRA STD. <br />PLAN 2006 <br />SF <br />120 <br />$15 <br />$1,800 <br />02513 -06 <br />REMOVE 4" TO 8" AC PAVEMENT AND COORDINATE WITH OTHERS TO <br />JINSTALL THE RAILROAD SIGNAL CONDUCTIVE LOOPS <br />SF <br />709 <br />$3 <br />$2,127 <br />02513 -07 <br />INSTALL 4" TO 8" AC AS REQUIRED, COORDINATE WITH OTHERS TO ENSURE <br />RAILROAD SIGNAL CONDUCTIVE LOOPS ARE TOPPED WITH 4" AC IN TWO <br />LIFTS <br />SF <br />1 709 <br />$8 <br />$5,672 <br />02513 -09 <br />REMOVE EXISTING PAVEMENT AND BASE AND INSTALL NEW AC PAVEMENT <br />AND BASE TO MATCH EXISTING PAVEMENT SECTION (MINIMUM 4" AC OVER <br />8" AB ) <br />SF <br />65 <br />$15 <br />$975 <br />02528-01 <br />8- CURB AND GUTTER (EXCAVATION, WATES OFFSITE, AND BACKFILL SHALL <br />BE CONSIDERED INCIDENTAL WORK ) <br />LF <br />10 <br />$60 <br />$600 <br />02528 -03 <br />8" DOWELED CONCRETE CURB <br />LF <br />216 <br />$18 <br />$3,888 <br />02528 -06 <br />6" PCC SIDEWALK (EXCAVATION, WATES OFFSITE, IMPORT AND GRADING <br />SHALL BE CONSIDERED INCIDENTAL WORK ) <br />SF <br />698 <br />$25 <br />$17,450 <br />02528 -11 <br />PLACE STAMPED CONCRETE IN MEDIAN ISLAND. THE UNIT PRICE INCLUDE <br />SAND BACKFILL AS REQUIRED TO PLACE SPECIFIED AC THICKNESS FLUSH <br />WITH TOP OF CURB <br />SF <br />653 <br />$15 <br />$9,795 <br />02580 -01 <br />SIGNING <br />LS <br />1 <br />$6,500 <br />$6,500 <br />02580 -02 <br />STRIPING <br />LS <br />1 <br />$6,440 <br />$6,440 <br />02820 -01 <br />4' HIGH WELDED WIRE MESH FENCE <br />LF <br />30 <br />$30 <br />$900 <br />02820 -05 <br />12' PIPE GATE PER SCRRA STD. PLAN 2915. <br />EA <br />2 <br />$3,000 <br />$6,000 <br />05520 -01 <br />HAND RAILING PER A.P.W.A. STD. PLAN 606 -2, TYPE A <br />LF <br />36 <br />$60 <br />$2,160 <br />05521 -01 <br />SELF CLOSING SWING GATE ASSEMBLY INCLUDING FABRICATION, <br />IFOUNDATION, AND INSTALLATION <br />EA <br />4 <br />$14,800 <br />$59,200 <br />09616 -01 <br />ADA DETACTABLE WARNING SURFACE <br />SF <br />64 <br />$45 <br />$2,880 <br />8000 -01 <br />RAILROAD SIGNAL AND RR ACTIVE WARNING DEVICES - BY OTHERS <br />LS <br />1 <br />$489,000 <br />$489,000 <br />LF <br />8 <br />$0 <br />CONSTRUCTION <br />SUBTOTAL <br />$663,713 <br />CONTINGENCY <br />$66,371 <br />Schedule 358 <br />- City of Santa Ana, 4th Street Crossing <br />TOTAL <br />$730,084 <br />:• <br />01570 -01 <br />• <br />MAINTENANCE AND PROTECTION OF TRAFFIC <br />LS <br />• <br />1 <br />$10,000 <br />• <br />$10,000 <br />02436 -02 <br />CONSTRUCT PIPE CULVERT HEADWALLS PER CALTRANS STD. PLANS 2006 <br />D89. THIS ITEM INCCUDE DEMOLITION, EXCAVATION AND EARTHWORK AS <br />REQUIRED <br />EA <br />1 <br />$3,000 <br />$3,000 <br />02459 -02 <br />REHAB EXISTING GRADE CROSSING PANELS BY OTHERS <br />TF <br />144 <br />$1,200 <br />$172,800 <br />02459 -02 <br />REHAB EXISTING GRADE CROSSING PANELS BY OTHERS <br />TF <br />64 <br />$1,200 <br />$76,800 <br />02513 -04 <br />7" AC PAVEMENT <br />SF <br />707 <br />$11 <br />$7,777 <br />02513 -05 IPLAN <br />VARIABLE A.C. PAVEMENT AT END OF CROSSING PANELS PER SCRRA STD. <br />2006 <br />SF 1 <br />120 <br />$15 <br />$1,800 <br />02513 -06 <br />REMOVE 4" TO 8" AC PAVEMENT AND COORDINATE WITH OTHERS TO <br />INSTALL THE RAILROAD SIGNAL CONDUCTIVE LOOPS <br />SF <br />2,178 <br />$3 <br />$6,534 <br />02513 -07 <br />INSTALL 4" TO 8" AC AS REQUIRED. COORDINATE WITH OTHERS TO ENSURE <br />RAILROAD SIGNAL CONDUCTIVE LOOPS ARE TOPPED WITH 4" AC IN TWO <br />LIFTS <br />SF <br />2,178 <br />$8 <br />$17,424 <br />02528 -03 <br />8" DOWELED CONCRETE CURB <br />LF <br />270 <br />$18 <br />$4,860 <br />02528 -06 <br />6" PCC SIDEWALK (EXCAVATION, WATES OFFSITE, IMPORT AND GRADING <br />SHALL BE CONSIDERED INCIDENTAL WORK ) <br />SF <br />843 <br />$25 <br />$21,075 <br />02528 -11 <br />PLACE STAMPED CONCRETE IN MEDIAN ISLAND. THE UNIT PRICE INCLUDE <br />SAND BACKFILL AS REQUIRED TO PLACE SPECIFIED AC THICKNESS FLUSH <br />WITH TOP OF CURB <br />SF <br />934 <br />$15 <br />$14,010 <br />02580 -01 <br />SIGNING <br />LS <br />1 <br />$5,000 <br />$5,000 <br />02580 -02 ISTRIPING <br />LS 1 <br />1 <br />$4,990 <br />$4,990 <br />Run ... 8117/08 100% Submittal 8!1512008 <br />