My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SOUTHERN CALIFORNIA REGIONAL RAIL AUTHORITY (SCRRA) (2) - 2008
Clerk
>
Contracts / Agreements
>
S
>
SOUTHERN CALIFORNIA REGIONAL RAIL AUTHORITY (SCRRA) (2) - 2008
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/14/2017 2:31:53 PM
Creation date
7/31/2009 11:00:55 AM
Metadata
Fields
Template:
Contracts
Company Name
SOUTHERN CALIFORNIA REGIONAL RAIL AUTHORITY (SCRRA)
Contract #
A-2008-285
Agency
PUBLIC WORKS
Council Approval Date
10/20/2008
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
119
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
6. To perform all work within the limits of the CITY right -of -way in a good and <br />workmanlike manner, and in accordance with plans and specifications approved <br />by the CITY. SCRRA's construction contractor shall obtain an encroachment <br />permit, at no fee to either SCRRA or it's contractor, from the City for the work <br />performed in the City's right of way. Changes or modifications during construction <br />that affect the CITY right -of -way shall be submitted to the CITY for written <br />approval. SCRRA shall conduct all of its activities in association with the <br />PROJECT in a good and competent manner and in compliance with all applicable <br />federal, state and local rules and regulations and SCRRA's applicable design <br />criteria, standards, policies, practices, and guidelines specifically including <br />SCRRA's Quiet Zone Implementation Guidelines and Procedures, attached as <br />Exhibit C. <br />To make all necessary arrangements for the protection, relocation or removal of <br />any public or private utility facility that conflicts with the PROJECT. <br />8. To obtain, prior to commencing construction work, and comply with any and all <br />approvals, permits, licenses and other authorizations required by applicable laws, <br />regulations, rules and ordinances, including obtaining CPUC approval of the <br />PROJECT plans. <br />9. To maintain, repair and renew each crossing area between lines two (2) feet <br />outside of the rails of each track. When two or more tracks are involved, SCRRA <br />shall maintain and repair, at its expense, the area between the tracks where the <br />distance between the centerlines of tracks is fifteen (15) feet or less measured at <br />the centerline of the highway, normal to the tracks. This work shall be done <br />pursuant to CPUC General Order 72 -B. <br />10. To maintain, repair, and renew the railroad automatic warning devices , pedestrian <br />warning devices, vehicle intrusion detection devices, emergency exit swing gates, <br />detectible warning tactile strips, striping between the warning devices and <br />channelization devices for pedestrians (fencing and hand railing). <br />SECTION II <br />CITY AGREES: <br />To conduct timely review of SCRRA's milestone plan submittals (30 %, 60 %, and <br />100°/x, and Final Design), timely review of changes to the plans constructed on <br />CITY right of way or jurisdiction during construction, timely submittal of SCRRA <br />traffic pre - emption timing requests, timely review and approval of final SCRRA <br />construction plans, timely granting of encroachment permits to SCRRA and its <br />construction contractors (upon request by the construction contractor in order to <br />not create any construction related delays to the Project), and timely granting of <br />grade crossing closure requests including traffic detour plans to perform the work <br />included in the PROJECT. In the event the CITY fails to provide timely review <br />OCTA Safety Enhancement Project Page 4 of 14 Construction and Maintenance Agreement <br />City of Santa Ana <br />
The URL can be used to link to this page
Your browser does not support the video tag.