Orange County Grade Crossing Safety Improvement Program COST ESTIMATE
<br />09616 -01
<br />ADA DETACTABLE WARNING SURFACE
<br />SF
<br />2fi
<br />$45
<br />2890 -11
<br />TRAFFIC SIGNAL IMPROVEMENTS - SAN7A ANA BOULEVARD
<br />LS
<br />$1,170
<br />8000 -01
<br />RAILROAD SIGNAL AND RR ACTIVE WARNING DEVICES- BY OTHERS
<br />LS
<br />1
<br />1
<br />$141,900
<br />$504,000
<br />$141,900
<br />$504,000
<br />CONSTRUCTION
<br />SUBTOTAL
<br />$855,954
<br />Schedule 34B
<br />- City of Santa Ana, Santa Ana Boulevard Crossin
<br />CONTINGENCY
<br />$85,595
<br />TOTAL
<br />$941,549
<br />01570 -01
<br />MAINTENANCE AND PROTECTION OF TRAFFIC
<br />LS 1
<br />$10,000
<br />$10,000
<br />02050 -07
<br />REMOVE EXISTING CURB AND GUTTER
<br />LF 20
<br />$25
<br />$500
<br />02050 -09
<br />REMOVE EXISTING CONCRETE PAVEMENT
<br />SF 120
<br />$5
<br />$600
<br />02459 -02
<br />REHAB EXISTING GRADE CROSSING PANELS BY OTHERS
<br />TF 24
<br />$1,200
<br />$28,800
<br />02513 -04
<br />7" AC PAVEMENT
<br />SF 76fi
<br />$11
<br />$8,426
<br />VARIABLE A.C. PAVEMENT AT END OF CROSSING PANELS PER SCRRA STD.
<br />02513 -05
<br />PLAN 2006
<br />SF 120
<br />$15
<br />$1,800
<br />REMOVE 4" TO 8" AC PAVEMENT AND COORDINATE WITH OTHERS TO
<br />02513 -06
<br />INSTALL THE RAILROAD SIGNAL CONDUCTIVE LOOPS
<br />SF 709
<br />$3
<br />1 $2,127
<br />INSTALL 4" TO 8" AC AS REQUIRED. COORDINATE WITH OTHERS TO ENSURE
<br />RAILROAD SIGNAL CONDUCTIVE LOOPS ARE TOPPED WITH 4" AC IN TWO
<br />02513 -07
<br />LIFTS
<br />SF 709
<br />$8
<br />$5,672
<br />REMOVE EXISTING PAVEMENT AND BASE AND INSTALL NEW AC PAVEMENT
<br />AND BASE TO MATCH EXISTING PAVEMENT SECTION (MINIMUM 4" AC OVER
<br />02513 -09
<br />8 "AB
<br />SF
<br />65
<br />$15
<br />$975
<br />8" CURB AND GUTTER (EXCAVATION, WATES OFFSITE, AND BACKFILL SHALL
<br />02528 -01
<br />BE CONSIDERED INCIDENTAL WORK )
<br />LF
<br />10
<br />$60
<br />$600
<br />02528 -03
<br />8" DOWELED CONCRETE CURB
<br />LF
<br />216
<br />$18
<br />$3,888
<br />6" PCC SIDEWALK (EXCAVATION, WATES OFFSITE, IMPORT AND GRADING
<br />02528 -06
<br />SHALL BE CONSIDERED INCIDENTAL WORK )
<br />SF
<br />698
<br />$25
<br />$17,450
<br />PLACE STAMPED CONCRETE IN MEDIAN ISLAND. THE UNIT PRICE INCLUDE
<br />SAND BACKFILL AS REQUIRED TO PLACE SPECIFIED AC THICKNESS FLUSH
<br />02528 -11
<br />WITH TOP OF CURB
<br />SF
<br />653
<br />$15
<br />$9,795
<br />02580 -01
<br />SIGNING
<br />LS
<br />1
<br />$6,500
<br />$6,500
<br />02580 -02
<br />STRIPING
<br />LS
<br />1
<br />$6,440
<br />$6,440
<br />02820 -01
<br />4' HIGH WELDED WIRE MESH FENCE
<br />LF
<br />30
<br />$30
<br />$900
<br />02820 -05
<br />12' PIPE GATE PER SCRRA STD. PLAN 2915.
<br />EA
<br />2
<br />$3,000
<br />$6,000
<br />05520 -01
<br />HAND RAILING PER A.P.W.A. STD. PLAN 606 -2, TYPE A
<br />LF
<br />36
<br />$60
<br />$2,160
<br />SELF CLOSING SWING GATE ASSEMBLY INCLUDING FABRICATION,
<br />05521 -01
<br />FOUNDATION, AND INSTALLATION
<br />EA
<br />4
<br />$14,800
<br />$59,200
<br />09616 -01
<br />ADA DETACTABLE WARNING SURFACE
<br />SF
<br />64
<br />$45
<br />$2,880
<br />8000 -01
<br />RAILROAD SIGNAL AND RR ACTIVE WARNING DEVICES - BY OTHERS
<br />LS
<br />1
<br />$489,000
<br />$489,000
<br />LF
<br />8
<br />$0
<br />CONSTRUCTION
<br />SUBTOTAL
<br />$663,713
<br />CONTINGENCY
<br />$66,371
<br />Schedule 35B
<br />- City of Santa Ana, 4th Street Crossing
<br />TOTAL
<br />$730,084
<br />01570 -01
<br />MAINTENANCE AND PROTECTION OF TRAFFIC
<br />LS
<br />1
<br />$10,000
<br />$10,000
<br />CONSTRUCT PIPE CULVERT HEADWALLS PER CALTRANS STD. PLANS 2006
<br />D89. THIS ITEM INCCUDE DEMOLITION, EXCAVATION AND EARTHWORK AS
<br />02436 -02
<br />REQUIRED
<br />EA
<br />1
<br />$3,000
<br />$3,000
<br />02459 -02
<br />REHAB EXISTING GRADE CROSSING PANELS BY OTHERS
<br />TF
<br />144
<br />$1,200
<br />$172,800
<br />02459 -02
<br />REHAB EXISTING GRADE CROSSING PANELS BY OTHERS
<br />TF
<br />64
<br />$1,200
<br />$76,800
<br />02513 -04
<br />7" AC PAVEMENT
<br />SF
<br />707
<br />$11
<br />$7,777
<br />VARIABLE A.C. PAVEMENT AT END OF CROSSING PANELS PER SCRRA STD.
<br />02513 -05
<br />PLAN 2006
<br />SF
<br />120
<br />$15
<br />$1,800
<br />REMOVE 4" TO 8" AC PAVEMENT AND COORDINATE WITH OTHERS TO
<br />02513 -06
<br />INSTALL THE RAILROAD SIGNAL CONDUCTIVE LOOPS
<br />SF
<br />2,178
<br />$3
<br />$6,534
<br />INSTALL 4" TO 8" AC AS REQUIRED. COORDINATE WITH OTHERS TO ENSURE
<br />RAILROAD SIGNAL CONDUCTIVE LOOPS ARE TOPPED WITH 4" AC IN TWO
<br />02513 -07
<br />LIFTS
<br />SF
<br />2,178
<br />$8
<br />$17,424
<br />02528 -03
<br />8" DOWELED CONCRETE CURB
<br />LF
<br />270
<br />$18
<br />$4,860
<br />6" PCC SIDEWALK (EXCAVATION, WATES OFFSITE, IMPORT AND GRADING
<br />02528 -06
<br />SHALL BE CONSIDERED INCIDENTAL WORK )
<br />SF
<br />843
<br />$25
<br />$21,075
<br />PLACE STAMPED CONCRETE IN MEDIAN ISLAND. THE UNIT PRICE INCLUDE
<br />SAND BACKFILL AS REQUIRED TO PLACE SPECIFIED AC THICKNESS FLUSH
<br />02528 -11
<br />WITH TOP OF CURB
<br />SF
<br />934
<br />$15
<br />$14,010
<br />02580 -01
<br />SIGNING
<br />LS
<br />1
<br />$5,000
<br />$5,000
<br />02580 -02
<br />STRIPING
<br />LS
<br />1
<br />$4,990
<br />$4,990
<br />Run...8/17 108 100% Submittal 8/15/2008