Laserfiche WebLink
<br />DISTRICT AGREEMENT <br />12-522 <br />ATTACHMENT 2 <br />DESIGN PHASE ACTIVITIES <br />RESPONSIBILITY <br />STATE CITIES <br />PROJECT ACTIVITY <br />1. PRELIMINARY COORDINATION <br />Request I -Phase EA X <br />Field Review of Site X X <br />Provide Geometrics X <br />Approve Geometrics ~ X <br />Obtain Surveys & Aerial Mapping X <br />Obtain Copies of Assessor Maps and Other R/W Maps X <br />Obtain Copies of As-Builts X <br />Send Approved Geometrics to Local Agencies for Review X <br />Revise Approved Geometrics if Required X <br />Approve Final Geometrics X <br />Determine Need for Permits from Other Agencies X X <br />Request Permits X <br />Initial Hydraulics Discussion with District Staff X <br />Initial Electrical Design Discussion with District Staff X <br />Initial Traffic & Signing Discussion with District Staff X <br />Initial Landscape Design Discussion with District Staff X <br />Plan Sheet Format Discussion X X <br />2. ENGINEERING STUDIES AND REPORTS <br />Prepare & Submit Materials Report & Typical Section X <br />Review and Approve Materials Report & Typical Section X <br />Prepare & Submit Landscaping Recommendation X <br />Review & Approve Landscaping Recommendation X <br />Prepare & Submit Hydraulic Design Studies X <br />Review & Approve Hydraulic Design Studies X <br />Prepare & Submit Bridge APS, Structures Foundation, General Plan & X <br />Structure Type Selection <br />Review & Approve Bridge APS, Structures Foundation, General Plan & X <br />Structure Type Selection <br />