Laserfiche WebLink
DISTRICT AGREEMENT <br />12-522 <br />ATTACHMENT 2 <br />DESIGN PHASE ACTIVITIES <br />PROJECT ACTIVITY <br />1. PRELIMINARY COORDINATION <br />Request 1 -Phase EA <br />Field Review of Site <br />Provide Geometrics <br />Approve Geometrics <br />Obtain Surveys & Aerial Mapping <br />Obtain Copies of Assessor Maps and Other R/W Maps <br />Obtain Copies of As-Builts <br />Send Approved Geometrics to Local Agencies for Review <br />Revise Approved Geometrics if Required <br />Approve Final Geometrics <br />Determine Need. for Permits from Other Agencies <br />Request Permits <br />Initial Hydraulics Discussion with District Staff <br />Initial Electrical Design Discussion with District Staff <br />Initial Traffic & Signing Discussion with District Staff <br />Initial Landscape Design Discussion with District Staff <br />Plan Sheet Format Discussion <br />2. ENGINEERING STUDIES AND REPORTS <br />Prepare & Submit Materials Report & Typical Section <br />Review and Approve Materials Report & Typical Section <br />Prepare & Submit Landscaping Recommendation <br />Review & Approve Landscaping Recommendation <br />Prepare & Submit Hydraulic Design Studies <br />Review & Approve Hydraulic Design Studies <br />Prepare & Submit Bridge APS, Structures Foundation, General Plan & <br />Structure Type Selection <br />Review & Approve Bridge APS, Structures Foundation, General Plan & <br />Structure Type Selection <br />RESPONSIBILITY <br />STATE CITIES <br />X <br />X X <br /> X <br />X <br /> X <br /> X <br /> X <br />X <br /> X <br />X <br />X <br />X <br />X <br />X <br />X <br />X <br />X <br />X <br />X <br />X <br />X <br />X <br />X <br />X <br />X <br />X <br />X <br />