My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SENTRY CONTROL SYSTEMS - 2009
Clerk
>
Contracts / Agreements
>
S
>
SENTRY CONTROL SYSTEMS - 2009
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/3/2012 2:07:11 PM
Creation date
8/7/2009 2:58:25 PM
Metadata
Fields
Template:
Contracts
Company Name
SENTRY CONTROL SYSTEMS
Contract #
A-2009-093
Agency
Finance & Management Services
Council Approval Date
6/8/2009
Insurance Exp Date
9/1/2009
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
58
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Proposal#: GJ-39869-2E <br />_~~~ ~ u ~ Attachment A <br />e o N T R O t~ s r s r ;t n~ s SCOPE OF INSTALLATION WORK <br />The following represents the actual scope of installation work to be performed on this job. Column (A) represents work to <br />be performed by Sentry Control Systems. Column (B) represents the work to be performed by others. "Others" is defined <br />as the owner or his assigned agent. "N/A" means that the described function is not applicable to this job. <br />(AI (B) <br />Cen4.,, lUl~ fl4herc Fnnr4inn <br />0 ^ ^ 1 All conduit with pull strin and junction boxes as specified by Sentry. <br /> ^ ^ 2 All required low voltage communication or control cable and installation of same. <br /> ^ ^ 3 All 115 VAC power at Sentry specified locations and connection of same. <br />^ ~ ^ 4 Location(s) to mount Sent provided equipment. <br /> ^ ^ 5 Plywood backboards at Sent desi Hated locations. <br /> <br />^ <br />^ <br />6 All final wiring terminations of low voltage communications or control cable on Sentry provided <br />equipment. <br /> ^ ^ 7 Mountin of Sent cabinets or boxes for controllers. <br />^ ~ ^ 8 Installation of electric lockin devices and associated hardware. <br /> <br />^ <br />~ <br />^ <br />9 All required door preparation to accept security door hardware (i.e. card readers, electric locks, <br />ma netic contacts, etc.) and installations of same. <br />^ ~ ^ 10 Any special door mullion or glass work. <br />^ ~ ^ 11 Any special fabrication work such as custom reader face plates or special mounting brackets. <br />^ ^ ~ 12 Parking islands with Sentry specified conduit and bollards. <br />0 ^ ^ 13 Mounting of parking lane equipment (i.e. gates, ticket dispensers, card readers, etc.). <br />0 ^ ^ 14 Mounting of card reader stanchions. <br /> ^ ^ 15 Removal of parkin booth. <br />^ ~ ^ 16 Securin of booth to deck. <br /> ^ ^ 17 Saw-cuts for vehicle loops. <br /> ^ ^ 18 La in of loop wire in saw-cuts and fillip same. <br /> ^ ^ 19 Obtainin required permits. (Fees associated with the permits are extra). <br /> ^ ^ 20 All preliminary/final shop drawings, blue lines, as-builts, etc. <br /> ^ ^ 21 Final system testing and checkout. All operational testing. <br /> ^ ^ 22 On-site trainin of the owner or owner's representative to properly operate the installed system. <br /> ^ ^ 23 Close-Out Package to be provided including Operator Manual. <br /> <br />0 <br />^ <br />^ <br />24 All work to be completed during normal business hours and overtime requested by customer is <br />not included. <br />^ ~ ^ 25 Installation of new elevator access control equipment. <br />Scope Page 1 of 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.