Laserfiche WebLink
(1) The Contractors Certified Irrigation Specialist shall meet once a month <br />with the Utility Coordinator to review the City's Monthly Water <br />Conservation Report (see Attachment 6) to discuss water conservation <br />strategies. These discussions may include, but not be limited to, the <br />Contractor turning off irrigation systems during periods of rainfall and <br />times when suspension of irrigation is desirable to conserve water while <br />remaining within the guidelines of the EAW. <br />(2) When the Utility Coordinator determines that plant material (turf, <br />groundcover, shrubs, and trees) must be irrigated, all controllers shall be <br />activated within twenty-four (24) hours. In the event the controllers are <br />not activated within 24 hours the City may charge Contractor all staff cost <br />incurred by City to activate controllers. <br />d) Inspection and Reporting <br />(1) The Contractor shall physically inspect the operation of all irrigation <br />systems once a month and prepare a written report specifying park name, <br />controller location/name, start times, run times, program name, station <br />number, and repairs needed. The Contractor shall maintain all sprinkler <br />systems using City standard irrigation products and details. All repairs <br />shall be to City specifications and details. Repairs to irrigation heads shall <br />be with matching precipitation nozzles. Contractor shall ensure that <br />excessive over spray /runoff into street right -of -ways or other areas not <br />intended to receive irrigation is controlled. The Contractor shall repair at <br />his own expense any irrigation head and lateral line rendered inoperable or <br />malfunctioning due to attrition vandalism, etc. <br />(2) Contractor shall perform a visual inspection of all irrigated areas once per <br />week. All areas receiving marginal coverage shall receive supplemental <br />irrigation by being irrigated by a portable irrigation method. The <br />contractor shall fumish all portable hoses, nozzles, sprinklers, etc., <br />necessary to accomplish this additional irrigation. Care shall be exercised <br />to prevent a waste of water, erosion, and/or detrimental seepage into <br />existing underground improvements or structures. <br />e) Repairs <br />The Contractor shall be responsible for repairs to all irrigation heads, swing <br />joints and lateral lines as a part of this agreement. The Director will be <br />responsible for repairs to the irrigation system from the valve to the water meter. <br />9. Hardscape Maintenance <br />a) All paved areas, including but not limited to paved parking lots, curb gutters, <br />pool decks, stamped or other enriched hard surface areas, shall be thoroughly <br />cleaned once a week between Monday and Friday. Vacuums, blowers, <br />sweepers or other approved equipment may be used to clean hardscape areas. <br />Debris shall not be blown or swept onto adjacent streets or property. All debris <br />24 <br />