My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ECONOLITE TRAFFIC ENGINEERING AND MAINTENANCE, INC. (AEGIS, ITS) - 2009
Clerk
>
Contracts / Agreements
>
E
>
ECONOLITE TRAFFIC ENGINEERING AND MAINTENANCE, INC. (AEGIS, ITS) - 2009
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/9/2014 1:37:45 PM
Creation date
11/20/2009 10:58:48 AM
Metadata
Fields
Template:
Contracts
Company Name
ECONOLITE TRAFFIC ENGINEERING & MAINTENANCE INC. (AEGIS, ITS)
Contract #
A-2009-124
Agency
Public Works
Council Approval Date
8/17/2009
Expiration Date
8/31/2012
Insurance Exp Date
4/27/2013
Destruction Year
2017
Notes
EFFECTIVE 1/1/12 ECONOLITE MERGED INTO AEGIS, ITS
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
63
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Addendum No. 1 July 9, 2009 <br />11. Extraordinary Maintenance <br />A. Material: Contractor's cost for the supply plus ( +) 15 %. <br />B. Labor: Contractor's rates (including all fringe benefits, markup, over heads, etc.) for all <br />job classifications involved in extraordinary maintenance. <br />Item # <br />7. <br />K <br />9. <br />10 <br />12. <br />13. <br />14. <br />15. <br />16. <br />Title <br />Superintendent <br />Engineering Technician <br />Laboratory Technician <br />Maintenance Technician -- Lead <br />Maintenance Technician <br />Utility Technician — Lead <br />Utility Technician <br />Lead High Voltage St. Light Tech. <br />Street Light Technician <br />Service Laborer <br />C. Labor and Material: <br />Straiaht Time <br />$(0 !q /hr <br />$ V4 /hr <br />$ S& 3't /hr <br />$ NO 3'Y /hr <br />$ W /hr <br />$ NO apt /hr. <br />$ (P 10 /hr. <br />$ 9 0 /hr. <br />$ 6634 /hr. <br />$ WO `hr. <br />Item # <br />Bid Item <br />Unit <br />17. <br />Install 6' diameter circular loop (1 - 5 loops) <br />EA <br />18. <br />Install 6' diameter circular loop (6 — 10 loops) <br />EA <br />19. <br />Install 6' diameter circular loop (1 I — 20 loops) <br />EA <br />20. <br />Install 6' diameter circular loop (over 20 loops) <br />EA <br />21. <br />Install City famished NEMA Conflict Monitor <br />EA <br />22. <br />Install City furnished P44 Cabinet <br />EA <br />23. <br />Install City furnished type 332 Cabinet <br />EA <br />24. <br />Adjust PPB Assembly height <br />EA <br />25. <br />Install /Replace complete PPB Assembly <br />EA <br />Overtime <br />$ 1 Z( _/hr. <br />$ 1 ZtV /hr. <br />S__/ i (P <br />/hr. <br />$ MO <br />/hr. <br />S <br />/hr. <br />$ l 1(v <br />/hr. <br />S 89 /hr. <br />$ / Z3 /hr. <br />$ 1 t (P <br />/hr. <br />$ 99 <br />/hr. <br />Unit Price <br />$__3c— <br />$ 2-6816" <br />$ 244— 60 <br />e zit tz —o <br />$ 700 <br />S /zoo <br />$ /Z00 <br />$ b6 <br />$ i 4Z <br />DA,ritr= <br />/77 <br />177 <br />/ &-7 <br />10-7 <br />129 <br />/ (0l <br />129 <br />17.3 <br />1(P 7 <br />1Z9 <br />Page 2 of 16 <br />
The URL can be used to link to this page
Your browser does not support the video tag.