My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ECONOLITE TRAFFIC ENGINEERING AND MAINTENANCE, INC. (AEGIS, ITS) - 2009
Clerk
>
Contracts / Agreements
>
E
>
ECONOLITE TRAFFIC ENGINEERING AND MAINTENANCE, INC. (AEGIS, ITS) - 2009
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/9/2014 1:37:45 PM
Creation date
11/20/2009 10:58:48 AM
Metadata
Fields
Template:
Contracts
Company Name
ECONOLITE TRAFFIC ENGINEERING & MAINTENANCE INC. (AEGIS, ITS)
Contract #
A-2009-124
Agency
Public Works
Council Approval Date
8/17/2009
Expiration Date
8/31/2012
Insurance Exp Date
4/27/2013
Destruction Year
2017
Notes
EFFECTIVE 1/1/12 ECONOLITE MERGED INTO AEGIS, ITS
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
63
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Addendum No. I July 9, 2009 <br />50. Vacuum Truck $ N _ /job trip <br />W. Cellular Phone / Radio Equipment <br />The Contractor shall provide four (4) cellular phone for City staff's use during this <br />contract (two for traffic signal maintenance and two for street light maintenance) to <br />facilitate communication with the Contractor at the Contractor's cost. <br />V. Bid Scenario — Street Light <br />For comparison purposes please bid the repair scenario utilizing the previous bid <br />prices. <br />The City of Santa Ana has experienced a street lighting outage in a neighborhood with <br />series high voltage street lighting. The outage encompasses several streets in the <br />neighborhood affecting 24 cast iron double king street lights with 2500 lumen lamps. A <br />night drive was required to identify the scope of the outage. The lighting repairs required <br />three (3) working days to complete the repairs. After completion of USA markings, the <br />following personnel, equipment and materials were dispatched to repair the lighting, <br />Two service personnel: Lead High Voltage Street Light Technician and a Service <br />Laborer for three days. <br />Cost: 3, 211f V <br />2. Night Drive: <br />Cost: —i9'- <br />3. Equipment: Service truck with a compressor for three days. <br />Cost: 141-3 <br />4. Materials Used: <br />300 If of #18 neoprene high voltage wiring <br />2 ea. #5 pull boxes, <br />3 ea. #3 pull boxes <br />19 ea. compression fittings <br />15 ea. bags of rock <br />6 ea. 2500660, 2500 lumen lamps <br />6 ea. Cut out disks <br />i32'+ <br />Supplier Cost: <br />Markup: 7 7 L 3 <br />Total Material Cost: 12 <br />Total Cost (item 14): S �/ _ ` t Z 55 <br />Page 4 of 16 <br />
The URL can be used to link to this page
Your browser does not support the video tag.