My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
75A - PH - WATER EFFICIENT LANDSCAPING
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2009
>
12/07/2009
>
75A - PH - WATER EFFICIENT LANDSCAPING
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/3/2012 4:13:34 PM
Creation date
12/2/2009 10:54:10 AM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Item #
75A
Date
12/7/2009
Destruction Year
2014
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
98
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
(B) The project applicant shall notify the City at the beginning of the installation <br /> work and at intervals, as necessary, for the duration of the landscape project work <br /> to schedule all required inspections. <br /> (C) Certification of Completion of the landscape project shall be obtained through a <br /> Certificate of Use and Occupancy or a Permit Final. The requirements for the <br /> Final Inspection and Permit Closure include submittal of: <br /> (1) A Landscape Installation Certificate of Completion in the form included as <br /> Appendix D of these standards, which shall include: (i) certification by a <br /> landscape professional that the landscape project has been installed per <br /> the approved Landscape Documentation Package; and (ii) the following <br /> statement: "The landscaping has been installed in substantial conformance <br /> to the design plans, and complies with the provisions of the Water <br /> Efficient Landscape Ordinance for the efficient use of water in the <br /> landscape." <br /> (2) Documentation of the irrigation scheduling parameters used to set the <br /> controller(s); <br /> (3) An irrigation audit report from a certified irrigation auditor, <br /> documentation of enrollment in regional or local water purveyor's water <br /> conservation programs, and/or documentation that the MAWA and <br /> EAWU information for the landscape project has been submitted to the <br /> local water purveyor, may be required at the option of the City. <br /> 2.8 Post-Installation Irrigation Scheduling <br /> (A) For the efficient use of water, all irrigation schedules shall be developed, <br /> managed, and evaluated to utilize the minimum amount of water required to <br /> maintain plant health. Irrigation schedules shall meet the following criteria: <br /> (1) Irrigation scheduling shall be regulated by automatic irrigation controllers. <br /> (2) Overhead irrigation shall be scheduled in accordance with the City's <br /> Water Conservation Ordinance. Operation of the irrigation system outside <br /> the normal watering window is allowed for auditing and system <br /> maintenance. <br /> 2.9 Post-Installation Landscape and Irrigation Maintenance <br /> (A) Landscapes shall be maintained to ensure water use efficiency in accordance with <br /> existing City's code. <br /> <br /> 2.l0Irrigation Audit, Irrigation Survey, and Irrigation Water Use Analysis. <br /> (A) All landscape irrigation audits shall be conducted by a certified landscape <br /> irrigation auditor. <br /> 15 <br /> 7 5A-44 <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.