Laserfiche WebLink
AGREEMENT BETWEEN CITY OF SANTA ANA AND CITY OF IRVINE <br /> FOR THE DYER ROAD/BARRANCA PARKWAY/RED HILL AVENUE <br /> INTERSECTION IMPROVEMENT PROJECT <br /> THIS DESIGN AND CONSTRUCTION AGREEMENT ("Agreement"), is made and <br /> <br /> entered into this day of , 2009, by and between the CITY OF SANTA ANA, a <br /> California charter city ("Santa Ana"), and the CITY OF IRVINE, a California charter city <br /> ("Irvine"). In this Agreement, Santa Ana and Irvine may each be individually referred to as a <br /> "Party" and collectively referred to as the "Parties." <br /> RECITALS: <br /> WHEREAS, Irvine has initiated and is proceeding with the Dyer Road/Barranca <br /> Parkway/Red Hill Avenue Intersection Improvement Project ("Project"), which includes the <br /> design and construction of additional through lanes in each direction along Dyer Road/Barranca <br /> Parkway and Red Hill Avenue, the addition of eastbound and westbound left-turn lanes on <br /> Barranca Parkway, and the addition of a westbound dedicated right-turn lane on Barranca <br /> Parkway and Red Hill Avenue; and <br /> WHEREAS, the Project involves Santa Ana and Irvine because the common city <br /> boundary line exists through the intersection of the Project; and <br /> WHEREAS, some of the Project includes work within Santa Ana; <br /> NOW, THEREFORE, based upon the foregoing Recitals, and for good and valuable <br /> consideration, the receipt and sufficiency of which is acknowledged by all Parties, the Parties <br /> agree as follows: <br /> 1. In accordance with the existing Agreement dated November 24, 1992 and Letter of <br /> Understanding dated January 6, 2006 between Santa Ana and Irvine, Irvine will act as <br /> lead agency for the design and construction phases of the Project. Irvine is responsible <br /> for funding the Project within the Santa Ana and Irvine city limits. Pursuant to the <br /> agreement, Irvine is responsible for "Total Cost" of the project. Total Cost includes the <br /> design, design administration, materials testing, site construction survey, inspection, <br /> construction engineering, construction management, as well as construction for the <br /> entire Project at no cost to Santa Ana. <br /> 2. Santa Ana will review, approve and sign the final design drawings for the <br /> improvements within the City limits of Santa Ana prior to bid advertisement. <br /> 3. Santa Ana will issue a no fee permit and inspect the improvements for general <br /> conformity to the plans and city standards within Santa Ana. <br /> 4. Santa Ana will coordinate the relocation of all affected utility company facilities <br /> within the City limits of Santa Ana in a timely manner. <br /> 25F-49 <br /> <br />