My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
DMS FACILITY SERVICES 1
Clerk
>
Contracts / Agreements
>
INACTIVE CONTRACTS (Originals Destroyed)
>
D (INACTIVE)
>
DMS FACILITY SERVICES 1
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/3/2015 3:00:00 PM
Creation date
4/23/2010 9:38:59 AM
Metadata
Fields
Template:
Contracts
Company Name
DMS LANDSCAPE
Contract #
A-2010-027
Agency
Parks, Recreation, & Community Services
Council Approval Date
2/16/2010
Expiration Date
3/31/2011
Insurance Exp Date
3/11/2012
Destruction Year
2016
Notes
Amended by A-2011-041
Document Relationships
DMS FACILITY SERVICES. LLC 1A
(Amended By)
Path:
\Contracts / Agreements\ INACTIVE CONTRACTS (Originals Destroyed)\D (INACTIVE)
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
87
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
contractor shall be responsible for mowing turf infields and other <br />designated ball diamond turf areas. (see Attachment 1). <br />(2) The Contractor shall maintain mowers that provide a smooth, even cut <br />without ridges or depressions and without tearing of the leaf blades <br />(caused by unsharpened mower blades). Mowing shall be performed at <br />the speed the mowers manufacturer specifies to maximize quality of cut. <br />Mowing shall be performed with straight and flowing patterns approved <br />by the Director's Representative. The emphasis will be on quality <br />mowing vs. speed and unprofessional patterns. From time to time the <br />Director will direct the Contractor to change mowing pattern to <br />minimize rutting and compaction. The Contractor shall mow grasses <br />and broadleaf plants once per month in the Santiago Park Day Camp <br />(Nature Reserve) meadow area. <br />b) Edging and Detailing <br />All edging shall be performed with the use of a McClain's edger or approved <br />substitute. Stick edgers are not allowed. Contractor shall edge all turf adjacent <br />to all improved hard surfaces such as concrete, decomposed granite, asphalted <br />concrete paved areas. Edging/detailing shall be performed at the same time <br />mowing occurs. Chemical detailing of turf may occur with the Director's <br />approval. If chemical detailing is performed, the Contractor shall use the string <br />trimmer to remove the treated turf within one (1) week after symptoms of <br />phytotoxicity become recognizable. <br />(1) The Contractor shall use the McClain's edger to edge straight lines along <br />fences, walls, or long flowing arcs. The Director's Representative may <br />require the Contractor to use string lines to edge straight lines if the <br />Contractor's staff fails to achieve this quality without this method. <br />(2) The Contractor shall detail around trees, along walls/fences and other <br />park amenities first using a sharpened shovel cut to establish a concentric <br />round circle around trees, poles, etc. Once the initial detailed circle is <br />established a string trimmer may be used to maintain the circle. Should <br />the circle begin to deform the Director shall direct the Contractor to <br />repeat the detail process. <br />(3) The Contractor shall detail turf not greater than 10" away from walls or <br />fences. Detail lines shall be made straight and shall be maintained <br />straight. The Contractor shall, at his own cost, supply top soil and an <br />approved turf seed to reduce any existing bare soil areas along <br />walls/fences that are greater than 10". <br />c) Soil Testing Amending/Top Dressing <br />8 <br />
The URL can be used to link to this page
Your browser does not support the video tag.