Laserfiche WebLink
8.0 Rainy Weather/Wet Field Procedure <br />8.1 On the next scheduled working day after a rainfall, the following procedure, in the order <br />listed, shall be adhered to: <br />8.1.1 Remove all standing water from low spots either by skimming off excess <br />water and spreading it out to dry areas or using a pump/sopper system. <br />8.1.2 Rake out (scarify) wet areas. <br />8.1.3 Apply Dry Gail Materials "Pro Gold with Stabilizer" Brickdust Materials <br />from stock to all Wet Areas and Rake Out. <br />9.0 Work to be Completed `BI -MONTHLY" <br />9.1 To maintain levelness of all fields, contractor shall, once every two months, scarify drag <br />built up amounts of materials at high spots and cut and level drag the scarified material <br />to low spots. The Contractor shall fill any remaining low spots with new Gail Materials <br />"Pro Gold with Stabilizer" brickdust from stock and make level. <br />Note: Staff shall identify areas to scarify/cut and level drag to <br />the contractor at weekly meetings with contractors <br />appointed site supervisor (as per section 6.2 of contract). <br />9.2 Heavy water scarified and cut and leveled areas to a '/2" min. depth and allow settling in <br />before play on field. <br />Note: Due to heavy watering and its need to settle before play, <br />staff shall provide a schedule of bi-monthly scarify/cut <br />and level drag dates to contractor. <br />10.0 Work to be Completed "ANNUALLY" <br />10.1 Each year, the following renovation is to be done on all fields in conjunction with the <br />City's Annual Sports Turf Renovation Schedule. Fields renovated may change from <br />year to year. <br />10.1.1 Contractor shall laser grade each ball diamond. Contractor shall scarify <br />drag built up amounts of materials at high spots and cut and level drag <br />the scarified material to low spots. The Contractor shall fill any <br />remaining low spots with new Gail Materials "Pro Gold with Stabilizer" <br />brickdust from stock and make level. <br />Note: Staff shall identify areas to scarify/cut and level drag at <br />the November meeting with contractor's owner (as per <br />section 6.3 of contract). <br />vii <br />