My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
DMS FACILITY SERVICES 1
Clerk
>
Contracts / Agreements
>
INACTIVE CONTRACTS (Originals Destroyed)
>
D (INACTIVE)
>
DMS FACILITY SERVICES 1
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/3/2015 3:00:00 PM
Creation date
4/23/2010 9:38:59 AM
Metadata
Fields
Template:
Contracts
Company Name
DMS LANDSCAPE
Contract #
A-2010-027
Agency
Parks, Recreation, & Community Services
Council Approval Date
2/16/2010
Expiration Date
3/31/2011
Insurance Exp Date
3/11/2012
Destruction Year
2016
Notes
Amended by A-2011-041
Document Relationships
DMS FACILITY SERVICES. LLC 1A
(Amended By)
Path:
\Contracts / Agreements\ INACTIVE CONTRACTS (Originals Destroyed)\D (INACTIVE)
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
87
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
8.0 Rainy Weather/Wet Field Procedure <br />8.1 On the next scheduled working day after a rainfall, the following procedure, in the order <br />listed, shall be adhered to: <br />8.1.1 Remove all standing water from low spots either by skimming off excess <br />water and spreading it out to dry areas or using a pump/sopper system. <br />8.1.2 Rake out (scarify) wet areas. <br />8.1.3 Apply Dry Gail Materials "Pro Gold with Stabilizer" Brickdust Materials <br />from stock to all Wet Areas and Rake Out. <br />9.0 Work to be Completed `BI -MONTHLY" <br />9.1 To maintain levelness of all fields, contractor shall, once every two months, scarify drag <br />built up amounts of materials at high spots and cut and level drag the scarified material <br />to low spots. The Contractor shall fill any remaining low spots with new Gail Materials <br />"Pro Gold with Stabilizer" brickdust from stock and make level. <br />Note: Staff shall identify areas to scarify/cut and level drag to <br />the contractor at weekly meetings with contractors <br />appointed site supervisor (as per section 6.2 of contract). <br />9.2 Heavy water scarified and cut and leveled areas to a '/2" min. depth and allow settling in <br />before play on field. <br />Note: Due to heavy watering and its need to settle before play, <br />staff shall provide a schedule of bi-monthly scarify/cut <br />and level drag dates to contractor. <br />10.0 Work to be Completed "ANNUALLY" <br />10.1 Each year, the following renovation is to be done on all fields in conjunction with the <br />City's Annual Sports Turf Renovation Schedule. Fields renovated may change from <br />year to year. <br />10.1.1 Contractor shall laser grade each ball diamond. Contractor shall scarify <br />drag built up amounts of materials at high spots and cut and level drag <br />the scarified material to low spots. The Contractor shall fill any <br />remaining low spots with new Gail Materials "Pro Gold with Stabilizer" <br />brickdust from stock and make level. <br />Note: Staff shall identify areas to scarify/cut and level drag at <br />the November meeting with contractor's owner (as per <br />section 6.3 of contract). <br />vii <br />
The URL can be used to link to this page
Your browser does not support the video tag.