Laserfiche WebLink
The SAPRF representative reserves the right to add and/or delete tree work on this project as <br />deemed necessary and in the best interest of the SAPRF. Additions and/or deletions shall be <br />made at the unit price accepted by SAPRF upon award of contract. <br />1.18 INSPECTIONS <br />An authorized SAPRF representative will inspect the work performed by the contractor to <br />insure completion of the pruning in accordance with SAPRF Pruning specifications. Should <br />more than two (2) inspections be required on trees needing additional work, the contractor will <br />be billed for SAPRF staff time. <br />1.19 BILLING <br />Contractor shall submit a fully itemized bill listing each tree noting: <br />a. Address (each tree). <br />b. Type of tree. <br />c. Date completed. <br />d. Person completing the job. <br />e. Location of tree (front, side right, side left, rear) <br />This information is vital to maintain the city's computerized tree inventory and management <br />system. <br />2.00 CONTRACTOR QUALIFICATIONS <br />All contractors are required to have a valid appropriate state contractor's license, current City of <br />Santa Ana business license, City Attorney approved certificate of insurance and be <br />knowledgeable in tree pruning and tree care prior to the commencement of any and all work. <br />2.01 STANDARD SPECIFICATIONS FOR PUBLIC WORKS CONSTRUCTION <br />The current edition of the "Green Book", Standard Specifications for Public Works <br />Construction and it's updates, supplements and local addendums, shall be included as part of <br />these specifications, unless otherwise directed in these specifications. <br />2.02 SPECIFICATIONS INTERPRETATION <br />The intent of these specifications is known by the City of Santa Ana and SAPRF. Any <br />questions relating to the interpretation of these specifications must be addressed, in writing, <br />prior to the start of work. The Contractor agrees that interpretations of this contract after the <br />start of work are at the SAPRF sole discretion, and the Contractor shall abide by all such <br />interpretations. <br />2.03 EXTRA WORK <br />In the event the Contractor is required by the City to perform extra work, the following <br />procedure shall govern such work: <br />a. When required, by the SAPRF representative, an itemized estimate of cost will be <br />submitted for approval prior to work being performed. The Contractor shall maintain <br />0J <br />