My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
DMS FACILITY SERVICES 1
Clerk
>
Contracts / Agreements
>
INACTIVE CONTRACTS (Originals Destroyed)
>
D (INACTIVE)
>
DMS FACILITY SERVICES 1
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/3/2015 3:00:00 PM
Creation date
4/23/2010 9:38:59 AM
Metadata
Fields
Template:
Contracts
Company Name
DMS LANDSCAPE
Contract #
A-2010-027
Agency
Parks, Recreation, & Community Services
Council Approval Date
2/16/2010
Expiration Date
3/31/2011
Insurance Exp Date
3/11/2012
Destruction Year
2016
Notes
Amended by A-2011-041
Document Relationships
DMS FACILITY SERVICES. LLC 1A
(Amended By)
Path:
\Contracts / Agreements\ INACTIVE CONTRACTS (Originals Destroyed)\D (INACTIVE)
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
87
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
The Contractor shall comply with all local sound control and noise level rules, regulations and <br />ordinances that apply to any work performed pursuant to the Contract. Each internal <br />combustion engine used for any purpose on the job or related to the job shall be equipped with <br />a muffler of a type recommended by the manufacturer of such equipment. No internal <br />combustion engine shall be operated on the project without said muffler. Full compensation for <br />conforming to the requirements of this section shall be considered as included in the prices paid <br />for the various contract items of work involved and no additional compensation will be allowed <br />therefore. Sounds, such as loud music, that are not related to the project, shall be kept at levels <br />so as to not disturb the general public. <br />2.13 TRAFFIC CONTROL <br />The Contractor shall notify the SAPRF representative of intent to begin the contract work at <br />least five (5) days before work is begun. The Contractor shall cooperate with local authorities <br />relative to handling traffic through the areas and shall make arrangements relative to keeping <br />the working area safe and clear of vehicles. <br />When entering or leaving roadways carrying public traffic, the Contractor's equipment, whether <br />empty or loaded, shall in all cases yield to public traffic. All traffic delineation and work area <br />protection shall conform to the Work Area Traffic Control Handbook (W.A.T.C.H.) 2000 <br />Edition. <br />The Contractor shall make every effort to keep commercial driveways open during working <br />hours. Should this not be possible, Contractor shall coordinate with the property owners <br />affected to insure that designated times of ingress and egress is available. After working hours, <br />all driveways shall,be accessible with smooth and safe crossings through any construction area <br />(State of California Traffic Manual). <br />2.14 INQUIRIES AND COMPLAINTS <br />The Contractor shall maintain an office at some fixed place and shall maintain a telephone <br />thereat, listed in the telephone directory in his own name or in the firm name by which he is <br />most commonly known. Furthermore, the Contractor shall, at all times, have some responsible <br />person(s), employed by the Contractor, to take the necessary action regarding all inquiries and <br />complaints that may be received from the City of Santa Ana, SAPRF, and/or private citizens <br />during normal working hours. <br />Whenever immediate action is required to prevent impending injury, death or property damage <br />to the facilities being maintained, the SAPRF representative may, after reasonable attempt to <br />notify the Contractor cause such action to be taken by the SAPRF work force. All costs of any <br />such action shall be charged against the Contractor, or the SAPRF may deduct such cost from <br />any amount due to Contractor from SAPRF. <br />All complaints shall be abated as soon as possible after notification, to the satisfaction of the <br />City of Santa Ana and/or SAPRF. If any complaint is not abated within a reasonable time, the <br />SAPRF representative shall be notified immediately of the reason for not abating the complaint <br />followed by a written report to the SAPRF representative within five (5) days. If the <br />complaints are not abated within the time specified or to the satisfaction of the SAPRF <br />12 <br />
The URL can be used to link to this page
Your browser does not support the video tag.