My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
MARIPOSA LANDSCAPES
Clerk
>
Contracts / Agreements
>
INACTIVE CONTRACTS (Originals Destroyed)
>
M-N (INACTIVE)
>
MARIPOSA LANDSCAPES
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/23/2021 12:55:40 PM
Creation date
4/23/2010 10:49:12 AM
Metadata
Fields
Template:
Contracts
Company Name
MARIPOSA LANDSCAPES
Contract #
A-2010-028
Agency
Parks, Recreation, & Community Services
Council Approval Date
2/16/2010
Expiration Date
3/21/2011
Destruction Year
2016
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
89
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
(2) The Contractor is responsible for inspecting all plant material on a <br />continuous basis and, as necessary, treating plant material to <br />maintain optimum health of the plants. If any plant material (turf, <br />groundcover, shrubs, trees) dies without the Contractor diagnosing <br />the plant and implementing efforts to restore the plant to a healthy <br />and attractive appearance, the City will assume the Contractor <br />caused the plant death. Contractor will be required to replace the <br />plant with like species and size at no extra cost to the City. City is <br />responsible for cost of replacing plants lost to vandalism; however, <br />Contractor must prove that it was vandalism that killed the plant. <br />In the case where turf is lost due to pest damage, the Contractors <br />shall replace the area of turf lost with Pacific Sod Greg Norman 1 <br />Hybrid Bermuda (during spring/summer) and Pacific Sod Greg <br />Norman 1 Hybrid Bermuda that has been cropped over with <br />Perennial Rye grass (during fall/winter). <br />8. Irrigation System Maintenance <br />a) General Responsibilities <br />(1) Contractor's Certified Irrigation Specialist shall use automatic or <br />mechanical irrigation systems to irrigate all landscape areas detailed <br />in this Agreement: In the event the existing irrigation system fails to <br />provide full and proper coverage, the Contractor shall provide <br />alternate irrigation with full and proper coverage to all areas in the <br />work site at no extra cost to the City. <br />(2) Newly planted trees, shrubs, ground cover and turf shall receive <br />adequate water to promote normal healthy growth. Proper berms or <br />basins shall be maintained during plant establishment period. <br />b) Operation of Automatic Irrigation Controllers <br />Where the operation of automatic irrigation controllers is required, the <br />Contractor shall: <br />(1) Not duplicate any coded City key furnished by the Parks, Recreation <br />& Community Services Agency for access and operation of the <br />controller. <br />(2) Surrender all keys furnished by the Parks, Recreation & Community <br />Services Agency at the end of the contract period or at any time <br />deemed necessary by the Director to prevent serious loss to the City <br />of Santa Ana. <br />18 <br />
The URL can be used to link to this page
Your browser does not support the video tag.