My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
MARIPOSA LANDSCAPES
Clerk
>
Contracts / Agreements
>
INACTIVE CONTRACTS (Originals Destroyed)
>
M-N (INACTIVE)
>
MARIPOSA LANDSCAPES
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/23/2021 12:55:40 PM
Creation date
4/23/2010 10:49:12 AM
Metadata
Fields
Template:
Contracts
Company Name
MARIPOSA LANDSCAPES
Contract #
A-2010-028
Agency
Parks, Recreation, & Community Services
Council Approval Date
2/16/2010
Expiration Date
3/21/2011
Destruction Year
2016
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
89
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
build-up with a sod cutter and re-establish the in -field boundaries <br />with a string line or suitable method and re -sod up to the border to <br />remedy the situation at contractors expense. Pre-existing <br />conditions shall be corrected during contract start-up. <br />7.6 Final Watering <br />7.6.1 This is the most time consuming and a very important element of <br />the procedure. <br />7.6.2 The contractor shall final water the skinned brick dust to a depth of <br />1/4" minimum. <br />8.0 Rainy Weather/Wet Field Procedure <br />8.1 On the next scheduled working day after a rainfall, the following procedure, in the <br />order listed, shall be adhered to: <br />8.1.1 Remove all standing water from low spots either by skimming off <br />excess water and spreading it out to dry areas or using a <br />pump/sopper system. <br />8.1.2 Rake out (scarify) wet areas. <br />8.1.3 Apply Dry Gail Materials "Pro Gold with Stabilizer" Brick dust <br />Materials from stock to all Wet Areas and Rake Out. <br />9.0 Work to be Completed `BI-MONTHLY" <br />9.1 To maintain levelness of all fields, contractor shall, once every two months, <br />scarify drag built up amounts of materials at high spots and cut and level drag the <br />scarified material to low spots. The Contractor shall fill any remaining low spots <br />with new Gail Materials "Pro Gold with Stabilizer" brick dust from stock and <br />make level. <br />Note: Staff shall identify areas to scarify/cut and level <br />drag to the contractor at weekly meetings with <br />contractors appointed site supervisor (as per section <br />6.2 of contract). <br />9.2 Heavy water scarified and cut and leveled areas to a %2" min. depth and allow <br />settling in before play on field. <br />Note: Due to heavy watering and its need to settle before <br />play, staff shall provide a schedule of bi-monthly <br />scarify/cut and level drag dates to contractor. <br />7 <br />
The URL can be used to link to this page
Your browser does not support the video tag.