Laserfiche WebLink
<br /> RESOLUTION 2010 <br /> PROPOSED <br /> REVENUE FY 09-10 FY 10-ll <br /> ACCOUNT DEPARTMENT/MISCELLANEOUS FEE OR SERVICE UNIT FEES FEES <br /> SECTION XI PUBLIC WORKS AGENCY <br /> 08617002-51704 Inspection Fees: <br /> Trench ExcavationlBack Fill <br /> (unless included in other fees) <br /> In Dirt-X127.58 minimum Linear Foot 0.71 0.71 <br /> Minimum 127.58 127.58 <br /> InPaving-$127.58 minimum Linear Foot 1.01 1.01 <br /> Minimum 127.58 127.58 <br /> 08617002-51704 Storm Drains/Culverts, Sewer, Water MainslLine Channels <br /> InDirt-$127.58 minimum Linear Foot 4.09 4.09 <br /> Minimum 127.58 127.58 <br /> In Paving-X127.58 minimum Linear Foot 4.66 4.66 <br /> Minimum 127.58 127.58 <br /> 08617002-51703 Sewer Laterals/Water Services Each 283.85 283.85 <br /> 08617002-51704 Traffic Occupancy or Lane Closure Requiring Signage <br /> All Streets Per Day 266.32 266.32 <br /> Minor Streets Deposit 842.06 842.06 <br /> Major Streets Deposit 1,121.13 1,121.13 <br /> 08617002-51704 Manhole, Vaults, Catch Basins and required signage, <br /> striping or barricades <br /> Plus Earthwork Each 213.69 213.69 <br /> 08617002-51704 Curb, Gutter or Combination including Earthwork <br /> $127.58 minimum Linear Foot 1.73 1.73 <br /> Minimum 127.58 127.58 <br /> 08617002-51704 Curb Return, including Earthwork <br /> $127.58 minimum Each 68.57 68.57 <br /> Minimum 127.58 127.58 <br /> 08617002-51704 Sidewalk including Earthwork <br /> $127.58 minimum Sq.Foot 0.62 0.62 <br /> Minimum 127.58 127.58 <br /> 08617002-51704 Drive Approach including Earthwork <br /> $127.58 minimum Sq. Foot 0.79 0.79 <br /> Minimum 127.58 127.58 <br /> 08617002-51704 Paving, including Earthwork <br /> (0 - 2000 sq. ft.) $127.58 minimum Sq. Foot 0.25 0.25 <br /> (Over 2000 sq. ft.) X127.58 minimum Sq. Foot 0.18 0.18 <br /> Minimum 127.58 127.58 <br /> 08617002-57006 Street Trees <br /> By Developer, Inspection Only - $90.60 minimum Each 32.71 32.71 <br /> 08617002-51704 Permanent Street Patch Guarantee <br /> Refundable if done in 30 calendar days Sq. Foot 32.14 32.14 <br /> 08617002-51704 Projects Exceeding X100,000 and/or Percent of estimated <br /> Work items not included here construction costs 3.25% 3.25% <br /> 65 <br /> 7 <br /> <br />