Laserfiche WebLink
RESOLUTION 2010-023 <br />REVENUE <br />ACCOUNT DEPARTMENT/MISCELLANEOUS FEE OR SERVICE UMT <br />SECTION IX PLANNING 8c BUILDING AGENCY <br />Projects prior t0 Moy 18, 2009, sha// be subject to therees indicated in Resolution 2009-018 <br />51602 30) Temporary Gas Service Each <br /> At [he time of application for temporary power, the owner <br /> shall post a $1,000.00 cash or cashier's check for each service meter. <br /> This deposit shall be released upon request after the <br /> Certificate of Completion or Certificate of Occupancy is issued- <br />51602 31) Inspections outside of normal business hours (4 hour <br /> minimum charge for Holidays, Saturday or Sunday Per Hour <br /> inspections). <br />51602 32) Re-inspection fee assessed under applicable provisions <br /> of the Building Code Per Hour <br />51602 33) Inspections for which no fee is specifically indicated <br /> (minimum charge -one (1) hour) Per Hour <br />51602 34) Additional plan review required by changes, additions or <br /> revisions to approved plans (minimum charge -one (1) hour) Per Hour <br /> PLUMBING PLAN CHECK FEES <br /> Whenever plumbing plans are required by the Building <br /> Official, plan check fees shall be 65 % of the plumbing <br /> permit fee and shall be paid at the time of submitting plans. <br /> GRADING PERMITS <br />S 1606 Any person desiring a grading permit required by the Building Each Permit <br /> Code, shall, at the time of filing an application, pay a fee of $6.55 <br /> towards the State Mandated Training Program and pay a fee <br /> equal to $31 .30 plus the sum of the fees for the work [o be done. <br /> under the permit as set forth in the following schedule: <br /> (Note: A grading permit fee is separate from and additional <br /> to the Fees for any other permit which may be <br /> required by code provisions.) <br /> FEE SCHEDULE <br /> Minimum <br />51606 1) Grading Permit: Per Hour <br /> a. One and Two S.F.D. 1 Hour <br /> b. Multiple Residential including, Residential tracts, <br /> Apartments, Condominiums, Hotels, Motels, and <br /> Similar Construction 2 Hours <br /> c. Non-Residential Site Less Than 2 Acres 3 Hours <br /> d. Non-Residential Site 2 Acres and More 5 Hours <br /> e_ Preliminary Grading Permit, Underground Tank <br /> Removal and Excavation for Soil Contamination 1 Hour <br /> f. Existing Parking Lot Resurfacing and Repainting 1 Hour <br />FY 10-11 <br />FEES <br />198.80 <br />7930 <br />79.30 <br />7930 <br />7930 <br />37 SS <br />79.30 <br />47 <br />