My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
FULL PACKET_2010-07-19
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2010
>
07/19/2010
>
FULL PACKET_2010-07-19
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/3/2012 4:02:02 PM
Creation date
7/15/2010 1:28:12 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Date
7/19/2010
Destruction Year
2015
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
270
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Estimated Entity Funded Prior <br /> Description of Improvement Cost (2004 Responsible to Indicated <br /> Dollars) For Triggering <br /> Im rovement Event Cash <br /> 6. Restripe: (1) WB Santa Claza to provide $50,000 Owner Building <br /> one LT lane and one shared LT/RT lane; Permit <br /> (2) NB Grand Avenue from Fruit Street to <br /> 14`h Street at Santa Ana Blvd/I-5 HOV <br /> ramps to provide three NB travel lanes; (3) <br /> I-5 NB off-ramps to provide a WB LT lane, <br /> a shared LT/RT lane and a RT lane at <br /> Grand Ave. <br /> 7. Remove existing on-street parking stalls $300,000 Owner Building <br /> and parking meters on Main Street from Permit <br /> Civic Center Dr. to Buffalo St.., restripe <br /> and slurry seal this Main Street segment to <br /> <br /> provide three NB and two SB travel lanes, <br /> and construct median on Main St. south of <br /> 10th Street. <br /> 8. Acquire necessary ROW and construct $6,500,000 Owner, Final Map <br /> southbound RT lane at Main/17~h and unless City <br /> <br /> Broadway/17`h, including striping, traffic undertakes per <br /> signal modification, and ADA compliant section 5.1.1 <br /> <br /> wheel chair ramps. <br /> 9. Implement neighborhood traffic plans to $1,200,000 City Six month <br /> mitigate changes in traffic patterns or (actual cost, prior to <br /> increased cut through traffic resulting from not an issuance of <br /> the One Broadway Plaza Project in French estimate) the first <br /> Park, French Court, Willazd, Floral Park, certificate of <br /> West Floral Pazk, and Washington Square occupancy but <br /> <br /> Neighborhoods. Traffic plans costs shall no later than <br /> include traffic studies, staff time to process 22 month <br /> neighborhood traffic plan, and the from the 151 <br /> construction of appropriate semi-diverters, building <br /> dia onal diverters, and street closures. ermit <br /> 7 <br /> 75A-13 <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.