Laserfiche WebLink
<br /> i <br /> Estimated Entity Funded Prior <br /> Description of Improvement Cost (2004 Responsible to Indicated <br /> Dollars) For Triggering <br /> r <br /> 6. Restripe: (1) WB Santa Clara to provide $50,000 Owner Building <br /> one LT lane and one shazed LT/RT lane; Permit <br /> (2) NB Grand Avenue from Fruit Street to <br /> 14°i Street at Santa Ana Blvd/I-S HOV <br /> ramps to provide three NB travel lanes; (3) <br /> I-5 NB off-ramps to provide a WB LT lane, <br /> a shared LT/RT Iane and a RT lane at <br /> rand Ave. <br /> 7. Remove existing on-street parking stalls $300,000 Owner Building <br /> and parking meters on Main Street from Permit <br /> Civic Center Dr. to Buffalo St., restripe and <br /> slurry sea! this Main Street segment to <br /> provide three NB and two SB travel lanes, <br /> and construct median on Main St. south of <br /> 10th Street. <br /> 8. Acquire necessary ROW and construct $6,500,000 Owner, Final Map <br /> southbound RT lane at Main/17`h and unless City <br /> Broadway/17's, inctuding striping, traffic undertakes per <br /> signal modification, and ADA compliant section 5.1.1 <br /> wheel chair ramps. <br /> 9. Implement neighborhood traffic plans to $1,200,000 City Building <br /> mitigate changes in traffic patterns or (actual cost, Permit <br /> increased cut through traffic resulting from not an <br /> the One Broadway Plaza Project in French estimate) <br /> Park, French Court, Willard, Floral Park, <br /> West Floral Park, and Washington Square <br /> Neighborhoods. Traffic plans costs shall <br /> include traffic studies, staff time to process <br /> neighborhood tratTc plan, and the <br /> construction of appropriate semi-diverters, <br /> die nal diverter and treat cl s <br /> <br />