My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Item 18 Agreement with HDR Engineering, Inc. to Conduct the First Street Multimodal Boulevard Study
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2025
>
05/20/2025
>
Item 18 Agreement with HDR Engineering, Inc. to Conduct the First Street Multimodal Boulevard Study
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/14/2025 3:23:53 PM
Creation date
5/14/2025 3:23:15 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda
Agency
Public Works
Item #
18
Date
5/20/2025
Destruction Year
P
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
93
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CITY OF SANTA ANA <br />10 <br /> <br /> <br />Subtask 4.8: Environmental Clearance <br />The consultant will identify and prepare the appropriate level of CEQA documentation to environmentally <br />clear the locally preferred alternative. <br /> <br />Task 4 – Deliverables (One hard copy and an electronic version of each): <br />- Constraints and Opportunities Matrix and Technical Memorandum <br />- Alternative Conceptual Layouts and Alternatives Summary Technical Memorandum <br />- Programmatic Cost Estimates <br />- Alternatives Evaluation and Feasibility Technical Memorandum <br />- Master Project Risk Register <br />- Funding Strategies Technical Memorandum <br />- Implementation Strategy and Schedule Technical Memorandum <br />- CEQA Documentation <br /> <br />V. Task 5: Plan Production and Approval <br /> <br />Subtask 5.1: Draft Plan <br />The consultant shall prepare draft plan (PS&E package for 30%, 60%, and 90% design) for review and <br />comment for the locally approved alternative. <br /> <br />Subtask 5.2: Draft Final Plan <br />The consultant shall prepare a Draft Final Plan that incorporates the comments received in Subtask 5.1. <br />The Draft Final Plan will be subject to a final round of review and comment by the City of Santa Ana, <br />OCTA, and other identified stakeholders. <br /> <br />Subtask 5.3: Final Plan <br />The consultant shall prepare final PS&E package (Final Plan), incorporating the comments and <br />revisions from Subtask 5.2. The Final Plan is expected to include a write-up and description of the <br />funding needs for the subsequent construction phase. <br /> <br />Task 5 – Deliverables (One hard copy and an electronic version of each): <br />- Draft PS&E Package (30%, 60%, and 90%) <br />- Draft Final PS&E Package <br />- Final PS&E Package and Construction Funding Needs Summary <br />- Presentation <br />VI. Task 6: Contingency <br /> <br />Consultant shall allocate a 10% Project Management contingency for miscellaneous project-related <br />issues. <br />VII. Attachments <br />A. Attachment A - Santa Ana Cooperative Transit Study.
The URL can be used to link to this page
Your browser does not support the video tag.